Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Details  





2 Electricity production  





3 See also  





4 References  





5 External links  














Spinning Spur Wind Ranch







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 35°1637N 102°4058W / 35.27694°N 102.68278°W / 35.27694; -102.68278
 

From Wikipedia, the free encyclopedia
 


Spinning Spur Wind Ranch
Map
Official nameSpinning Spur Wind Ranch
CountryUnited States
LocationOldham County, Texas
Coordinates35°16′37N 102°40′58W / 35.27694°N 102.68278°W / 35.27694; -102.68278
Construction beganJune 2012
Commission dategradually thru Sept 2015
Owner(s)Google (SS1),
EDF Renewables (SS2),
BlackRock and EDF Renewables (SS3)
Operator(s)EDF Renewable Services
Wind farm
TypeOnshore
Power generation
Units operational254 turbines
Make and model70Siemens SWT-2.3 MW
87GE 1.85 MW
97Vestas V100-2 MW
Nameplate capacity516 MW
Capacity factor46.5% (average 2016-2017)
Annual net output2,100 GW·h

The Spinning Spur Wind Ranch is a 516 megawatt (MW) wind farm spanning the length of southern Oldham County in the northwest panhandle region of the U.S. state of Texas. The project was developed by Cielo Wind Power and EDF Renewable Energy in three phases that came online from 2012 to 2015.[1][2][3][4] Phases 2 and 3 are enabled by the Competitive Renewable Energy Zone (CREZ) transmission infrastructure completed in 2013 that was designed to bring electricity generated in energy-resource-rich western regions to industrialized population centers in the central and eastern regions of the state.[5][6]

Details[edit]

Construction began in June 2012 on the first phase of the facility located 30 miles west of Amarillo and spread over nearly 38,500 acres.[1][2] It completed in December 2012 and includes 70 Siemens SWT-2.3 MWwind turbines having blade diameters of over 100 meters.[7] The electricity is being sold to Amarillo-based Southwestern Public Service Company (a subsidiary of Xcel Energy) which services customers throughout western Texas and eastern New Mexico. Google announced upon the projects completion that it had invested $200 million in ownership of the facility.[8]

Construction on the second phase began in June 2013 located 40 miles west of Amarillo and spread over an additional nearly 14,000 acres.[3] It completed in December 2013 and includes 87 GE 1.85 MW turbines having 87 meter blade diameters.[9] For the first ten years, the electricity is being sold into the ERCOT grid which services 90% of the consumption in the state. This portion of the facility is solely owned by EDF Renewable Energy, with financing assistance from GE Energy Financial Services and MUFG Union Bank.[6]

The third phase of construction began in October 2014 and completed in September 2015.[4] It is located 50 miles west of Amarillo and spread over 18,000 acres. It uses 97 Vestas V100-2.0 MW turbines with 100 meter blade diameters.[10] The electricity is being sold to utilities in the City of Georgetown and the City of Garland. It provides for the majority of the consumption by Georgetown, which aims to source 100% of its electricity from renewables.[11] BlackRock announced upon the projects completion that it had taken a 50% ownership stake in the facility, along with EDF Renewable Energy.[12]

EDF Renewable Energy provides operational and maintenance support for all three phases of the facility via continuous monitoring from its operations and control center.[6]

Electricity production[edit]

Spinning Spur Electricity Generation (MW·h)
Year Spinning Spur 1
(161 MW) [13]
Spinning Spur 2
(161 MW) [14]
Spinning Spur 3
(194 MW) [15]
Total Annual
MW·h
2012 52,370* - - 52,370
2013 687,016 - - 687,016
2014 712,566 232,131* - 944,697
2015 666,425 547,504 224,955* 1,438,884
2016 686,636 611,912 814,372 2,112,920
2017 679,474 596,215 811,106 2,086,795
Average Annual Production (years 2016-2017) → 2,099,858
Average Capacity Factor (years 2016-2017) → 46.5%

(*) partial year of operation

See also[edit]

  • iconWeather portal
  • iconRenewable energy portal
  • References[edit]

    1. ^ a b "Spinning Spur 1 Wind". EDF Renewables. Retrieved April 15, 2019.
  • ^ a b "Spinning Spur Wind Ranch". Cielo Wind. Retrieved April 15, 2019.
  • ^ a b "Spinning Spur Two Wind Ranch". Cielo Wind. Retrieved April 15, 2019.
  • ^ a b "Spinning Spur 3 Wind". EDF Renewables. Retrieved April 15, 2019.
  • ^ "Transmission and CREZ Fact Sheet" (PDF). poweringtexas.com. Retrieved April 15, 2019.
  • ^ a b c "Spinning Spur II Wind Farm Project, Texas". Power Technology. Retrieved April 15, 2019.
  • ^ "Spinning Spur I (USA)". thewindpower.net. Retrieved April 15, 2019.
  • ^ David Goldham (January 10, 2013). "Google invests $200 million in Texas wind farm". CNN Business.
  • ^ "Spinning Spur II (USA)". thewindpower.net. Retrieved April 15, 2019.
  • ^ "Spinning Spur II (USA)". thewindpower.net. Retrieved April 15, 2019.
  • ^ "Wind Turbines Powering Georgetown". City of Georgetown. Retrieved April 15, 2019.
  • ^ "BlackRock Close on the Sale of 50 Percent Interest in the 194 MW Spinning Spur 3 Wind Project". Business Wire. November 20, 2015.
  • ^ "Spinning Spur 1, Annual". Electricity Data Browser. Energy Information Administration. Retrieved April 15, 2019.
  • ^ "Spinning Spur 2, Annual". Electricity Data Browser. Energy Information Administration. Retrieved April 15, 2019.
  • ^ "Spinning Spur 3, Annual". Electricity Data Browser. Energy Information Administration. Retrieved April 15, 2019.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Spinning_Spur_Wind_Ranch&oldid=969343175"

    Categories: 
    Energy infrastructure completed in 2015
    Wind farms in Texas
    Buildings and structures in Oldham County, Texas
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description matches Wikidata
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Wind farm articles using Infobox power station
    Pages using the Kartographer extension
     



    This page was last edited on 24 July 2020, at 20:51 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki