Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 See also  





2 References  





3 External links  














Tehachapi Renewable Transmission Project






Français
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


The Tehachapi Renewable Transmission Project 500kV eastern transition station in Chino Hills, California.

The Tehachapi Renewable Transmission Project is a project involving the construction of approximately 173 miles (278 km) of new and upgraded high-voltage transmission lines for transmission of electricity from wind farms and other generating units in southeastern Kern County, CaliforniatoLos Angeles County and San Bernardino County.

The project, developed and operated by Southern California Edison, commenced construction on March 7, 2008 and was completed and placed in operation in December 2016.[1] With a capacity of 4,500 megawatts, the transmission system can provide power for an estimated 3 million homes.[2]

It passes through sections of the Tehachapi Mountains, Sierra Pelona Mountains, and Antelope Valley.

State laws requiring SCE to provide at least 33% of its power service from renewable sources by 2020 is driving the project. SCE had no interest in owning the land that the project is on, but needed to construct the transmission system nonetheless to meet the renewable source laws.[3]

See also[edit]

References[edit]

  1. ^ "TRTP | Projects in Progress | Reliability | About Us | Home - SCE". www.sce.com. Retrieved 2017-03-14.
  • ^ "Southern California Edison Starts Construction on the Nation's Largest Wind Transmission Project" (Press release). Edison International. 2008-03-07. Archived from the original on 2011-07-10. Retrieved 2010-07-23.
  • ^ Southern California Edison Tehachapi Renewable Transmission Project Renewable Energy Projects. "SCE - Tehachapi Renewable Transmission Project". Archived from the original on 2012-07-17. Retrieved 2012-08-13.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Tehachapi_Renewable_Transmission_Project&oldid=1200692886"

    Categories: 
    Energy infrastructure in California
    Electric power transmission systems in the United States
    Southern California Edison
    Buildings and structures in Kern County, California
    Buildings and structures in Los Angeles County, California
    Sierra Pelona Ridge
    Tehachapi Mountains
    2016 establishments in California
    Hidden category: 
    Official website different in Wikidata and Wikipedia
     



    This page was last edited on 30 January 2024, at 02:01 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.