Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Planned capacity  





2 Phase I  





3 Battery storage pilot project  





4 See also  





5 References  














Titan Wind Project







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 44°3058N 99°126W / 44.51611°N 99.20167°W / 44.51611; -99.20167
 

From Wikipedia, the free encyclopedia
 


Titan Wind Project
Map
CountryUnited States
LocationHand County, South Dakota
Coordinates44°30′58N 99°12′6W / 44.51611°N 99.20167°W / 44.51611; -99.20167
StatusPhase I operating
Commission datePhase I: 2009
Owner(s)BP Wind Energy[1]
Power generation
Units operational10 x 2.5 MW Liberty Wind Turbines
Nameplate capacityPhase I: 25 MW

The Titan Wind Project is 25MW wind farm which had a proposed expansion to 5,050 MW, formerly known as Rolling Thunder, based in South Dakota. The project developers, Clipper Windpower and BP Alternative Energy, expected to build Titan in several phases and, when completed, it would have been one of the largest wind farms in the world.[2][3][4][5]

The complete wind farm would have used up to 2,020 of Clipper's Liberty 2.5 MW wind turbines.[2] However, this is no longer planned, as Clipper Windpower has since ceased production of wind turbines due to financial problems and the potential capacity is double local demand.[5]

Planned capacity[edit]

Operating at full planned capacity, the proposed expansion would be able to supply the electricity for 100% of the households in the state several times over. South Dakota's entire electricity consumption in 2005 was 9.811 TWh.[6] At an assumed capacity factor of 40% (roughly what is currently observed in South Dakota), a 5.05 GW nameplate capacity would correspond to an annual generation of 17.7 TWh.

Phase I[edit]

Construction of phase I began in 2009 on a 7,500-acre (3,000 ha) site in Hand County in the Ree Hills south of Ree Heights.[1] The project was complete by the end of the year.[7] Phase I consists of 10 Liberty C89 2.5 MW wind turbines for a combined nameplate capacity of 25 MW. Northwestern Energy has a long-term power purchase agreement.[1][7]

Battery storage pilot project[edit]

As of 2018, BP is planning to use the project as a pilot for battery storage with Tesla.[8]

See also[edit]

  • iconRenewable energy portal
  • References[edit]

    1. ^ a b c "BP Ramps Up to Full Construction of First Phase of Wind Farm in South Dakota". BP Alternative Energy. 2009-08-05. Retrieved 2010-03-16.
  • ^ a b "Titan Wind Project To Produce 5,050 MW". Renewable Energy World. 2008-08-05. Retrieved 2010-03-17.
  • ^ "Clipper & BP Complete Titan Wind Turbine Deal". Renewable Energy World. 2008-12-04. Retrieved 2010-03-17.
  • ^ "Clipper Windpower and BP Alternative Energy form Joint Venture to Develop up to 5,050 MW". Clipper Windpower. 2008-07-30. Archived from the original on 2013-01-19. Retrieved 2010-03-17.
  • ^ a b Mark Anderson (2012-04-01). "End of the road for 5GW mega project". Wind power monthly. Retrieved 2018-12-21.
  • ^ "Electric Power and Renewable Energy in South Dakota". USDOE, EERE. 2008-06-25. Retrieved 2010-03-15.
  • ^ a b "U.S. Wind Energy Projects - South Dakota". American Wind Energy Association. 2009-12-31. Retrieved 2010-03-16. [dead link]
  • ^ Jillian Ambrose (2018-04-10). "BP to store wind power with help from Tesla". The Telegraph. Retrieved 2018-12-21.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Titan_Wind_Project&oldid=1105771401"

    Categories: 
    Energy infrastructure completed in 2009
    Buildings and structures in Hand County, South Dakota
    Wind farms in South Dakota
    BP
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    All articles with dead external links
    Articles with dead external links from November 2010
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 21 August 2022, at 18:35 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki