Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  Tram and bus facilities  







2 Redesign of the track layout  



2.1  Reasons for the redesign  



2.1.1  The problem of the old layout  





2.1.2  The main measures  





2.1.3  The goals  







2.2  The design: learning from Japan  





2.3  The result  







3 Train services  



3.1  Tracks 14: Sprinter (local) services North & Northeast  





3.2  Tracks 5/7 and 18/19: Intercity / International services Northwest, South & East  





3.3  Tracks 812: Intercity services Northeast & West  





3.4  Tracks 14/15: Sprinter (local) services Northwest & East  





3.5  Tracks 20/21: Sprinter (local) services West & South  





3.6  Timetable  







4 Bus services  



4.1  Busstation Centrumzijde  





4.2  Busstation Jaarbeurszijde  







5 Tram services  





6 Bicycles  





7 References  





8 External links  














Utrecht Centraal railway station






Català
Deutsch
Español
Euskara
Français
Frysk
Bahasa Indonesia
Italiano
עברית
Magyar
مصرى
Nederlands

Polski
Simple English
Tagalog

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 52°521N 5°635E / 52.08917°N 5.10972°E / 52.08917; 5.10972
 

From Wikipedia, the free encyclopedia
 


Utrecht Centraal
Utrecht Centraal in 2019
General information
LocationUtrecht
Netherlands
Coordinates52°5′21N 5°6′35E / 52.08917°N 5.10972°E / 52.08917; 5.10972
Owned byProRail
Operated byNederlandse Spoorwegen
Line(s)Amsterdam–Arnhem railway
Utrecht–Rotterdam railway
Utrecht–Boxtel railway
Utrecht–Kampen railway
Tracks16
ConnectionsMainline rail interchange U-OV, Qbuzz Tram: 20, 21, 22
Bus transport U-OV, Qbuzz: 1, 2, 3, 4, 5, 6, 7, 8, 12, 24, 28, 38, 41, 47, 50, 55, 65, 73, 74, 77, 85, 285
Bus transport Provincie Utrecht, Syntus: 50, 102, 107, 120, 195/295
Bus transport Drechtsteden, Qbuzz: 90, 387, 388
Bus transport Bravo, Arriva: 400, 401
Bus transport Arriva: 195/295
Bus transport Flixbus: 056, 086, 800, 817, 833, N31, N800, K947
Construction
Platform levels2
ParkingN/A
Bicycle facilities29232 (not including OV-Fiets (Rental))
AccessibleLifts, escalators and 24/7 staff to aid with boarding.
ArchitectBenthem Crouwel
Other information
Station codeUt
Fare zone5000
Websitehttps://www.ns.nl/stationsinformatie/ut/utrecht-centraal
History
Opened18 December 1843; 180 years ago (1843-12-18)
Passengers
207.360 daily railway passengers (excluding transfers, 2019 statistics)[1]
Services
Preceding station DB Fernverkehr Following station
Amsterdam Centraal
Terminus
ICE 43 Arnhem Centraal
towards Basel SBB
ICE 78 Arnhem Centraal
Preceding station ÖBB Following station
Amsterdam Centraal
Terminus
Nightjet Arnhem Centraal
Arnhem Centraal
towards Zürich HB
Preceding station Nederlandse Spoorwegen Following station
Gouda NS Intercity 500 Reverses direction
Amersfoort Centraal
towards Groningen
Gouda NS Intercity 600
Amersfoort Centraal
towards Leeuwarden
Amsterdam Amstel
towards Den Helder
NS Intercity 800 's-Hertogenbosch
towards Maastricht
Amsterdam Centraal NS Nachtnet 1400
Night train
Terminus
Gouda NS Intercity 1700 Reverses direction
Amersfoort Centraal
Gouda
towards Enschede
NS Intercity 2000 Terminus
Gouda NS Intercity 2800
Amsterdam Bijlmer ArenA
towards Enkhuizen
NS Intercity 2900 's-Hertogenbosch
towards Maastricht
Amsterdam Amstel
towards Den Helder
NS Intercity 3000 Driebergen-Zeist
towards Nijmegen
Amsterdam Bijlmer ArenA NS Intercity 3100 Veenendaal-De Klomp
towards Nijmegen
Amsterdam Bijlmer ArenA NS Intercity 3200 Veenendaal-De Klomp
Amsterdam Bijlmer ArenA NS Intercity 3500 's-Hertogenbosch
towards Venlo
Amsterdam Bijlmer ArenA
towards Dordrecht
NS Intercity 3700
Amsterdam Amstel
towards Enkhuizen
NS Intercity 3900 's-Hertogenbosch
towards Heerlen
Gouda NS Intercity 11700 Reverses direction
Amersfoort Centraal
Terminus NS Nachtnet 21400
Night train
's-Hertogenbosch
Hilversum Sportpark NS Nachtnet 21500
Night train
Terminus
Amersfoort Centraal
Terminus
NS Nachtnet 22400
Night train
Terminus NS Nachtnet 23400
Night train
Driebergen-Zeist
towards Nijmegen
Utrecht Overvecht NS Sprinter 4900 Terminus
Utrecht Overvecht
towards Baarn
NS Sprinter 5500
Utrecht Overvecht
towards Zwolle
NS Sprinter 5600
Utrecht Overvecht
towards Hoofddorp
NS Sprinter 5700
Terminus NS Sprinter 6000 Utrecht Vaartsche Rijn
NS Sprinter 6700 Utrecht Vaartsche Rijn
towards Tiel
Utrecht Leidsche Rijn NS Sprinter 6900 Terminus
Utrecht Zuilen
towards Breukelen
NS Sprinter 7300 Utrecht Vaartsche Rijn
towards Rhenen
Utrecht Zuilen
towards Uitgeest
NS Sprinter 7400 Utrecht Vaartsche Rijn
Utrecht Leidsche Rijn NS Sprinter 8800 Terminus
NS Sprinter 8900
Utrecht Overvecht NS Sprinter 14900
Terminus NS Sprinter 28300 Utrecht Maliebaan
Terminus
Preceding station Arriva Following station
Amsterdam Bijlmer ArenA Nachttrein 32700 's-Hertogenbosch
towards Maastricht

Location

Utrecht Centraal is located in Northeastern Randstad
Utrecht Centraal

Utrecht Centraal

Location within Northeastern Randstad

Utrecht Centraal, officially Station Utrecht Centraal (Dutch: [staːˈʃɔn ˈytrɛxt sɛnˈtraːl]), is the transit hub that integrates three bicycle parkings, two bus stations, two tram stops and the central railway station for Utrecht, Netherlands. It is the biggest train station in the Netherlands.

Both the railway station and the bus station are the largest and busiest in the Netherlands. The bicycle parking station on the east side is the largest in the world.[2]

The railway station has sixteen platform tracks (of which twelve are through tracks) and 207,360 embarking and disembarking passengers per day, excluding transfers.[3] Because of its central location in the Netherlands, Utrecht Centraal is the most important railway hub of the country with more than 1,000 departures per day.

History

[edit]
Inside the station hall

The first railway station at the site was opened on December 18, 1843, when the Nederlandsche Rhijnspoorweg-Maatschappij opened the first station on Utrecht territory.

In 1938, the station became the central station as the Maliebaanstation, on the other side of the city, was closed and the line from Hilversum was diverted into the central station. The station building of 1865 remained in place, though a fundamental renovation was done in 1936. Two years later, a fire burned down most of the building, which was subsequently rebuilt.

The station building was demolished in the 1970s to make way for Hoog Catharijne, then Europe's largest enclosed shopping mall, which opened on 17 December 1973. From that moment onwards, the station no longer had a real entrance; the passageways of the shopping mall just continued into the station. In 1989 the station hall was enlarged (tripling the original size) to increase capacity and to solve bottlenecks. In 1995, the station hall was again enlarged, with the construction of a new platform.

Between 2011 and 2016, the station underwent a major reconstruction as one of the NSP[4] projects of the Dutch government and as part of a general reconstruction of the Utrecht station area.[5][6] The station hall was replaced by a new, much larger hall, housing all modes of public transport. The new structure with its curved roof, was designed by Benthem Crouwel Architekten. The roof has three curves: a large one in the middle for the railway station and two smaller ones for the bus/tram stations on either side. New sheltering roofs were built for all platforms and the station was separated from the Hoog Catharijne shopping area.[7]

A scale model of Utrecht Centraal is on display at Madurodam.[8]

Tram and bus facilities

[edit]

Light-rail (sneltram) service at Utrecht Centraal began in 1983 with the opening of the SUNIJ line (sneltram Utrecht-Nieuwegein/IJsselstein).[9] Its tram stop (named Utrecht Centraal) was originally located on the east side of the station. In 2009, when the nearby Moreelsepark tram terminal was closed, the Centraal stop was adapted to be the new terminal for the shortened SUNIJ line. At this time, the Centraal stop was given a minor makeover including provision for the OV-chipkaart and travel information displays.[10]

In 2013, to accommodate construction work at the railway station, the SUNIJ line was further shortened. The Centraal stop on the east side of the station was closed and replaced by a stop at Jaarbeursplein on the west side of the railway station, becoming the temporary terminal of the SUNIJ line.[11] The temporary Jaarbeursplein terminal had 3 tracks.[12]

In July 2016, the bus terminal on the east side of the station was also relocated to the west side ('Jaarbeurszijde'). This move made space available on the east side of the station for the construction of a new Centrumzijde (downtown side) bus and tram terminal as well as the construction of a new tram line (Uithoflijn), a new station square (Stationsplein), a bicycle storage facility and the Moreelse bridge.[13]

On 9 December 2019, the Centrumzijde bus and tram terminal opened at Utrecht Centraal. It is located under the main hall on the east side of the railway station, and riders can access it directly from the main hall.[14] On 16 December 2019, the Uithof line (Uithoflijn, tram route 22) started operation running from Centrumzijde to P+R Science Centre in the Uithof district.[15] Passengers who wanted to transfer between the SUNIJ and Uithof lines had to walk 500 metres (1,600 ft) between the Jaarbeursplein and Centrumzide stops.[16] There was a track between the two stops, but it was used only for Uithof trams returning to the depot without passengers. The platform heights for the SUNIJ and Uithof lines were incompatible.[17]

On 4 July 2020, the SUNIJ line was shut down for renovation including rebuilding the Jaarbeursplein stop. The stop was converted from a terminal for high-floor trams to a through-station for longer, low-floor trams. The old platforms were demolished, and the stub siding was eliminated. New side platforms were built along the through-tracks. Electrical overhead wires and track switches were also replaced.[18] On 3 January 2021, the Jaarbeursplein tram stop reopened with low-level platforms.[19]

On 2 July 2022, through-passenger service started between the Jaarbeursplein and Centrumzijde stops, thus eliminating the 500-metre walking transfer between the two stops at Utrecht Centraal. Trams would travel via the station between Nieuwegein and IJsselstein on the SUNIJ line and the Uithof district on the Uithof line (Uithoflijn).[16]

Redesign of the track layout

[edit]
  • t
  • e
  • Utrecht Centraal

     
    to Breukelen
     

    to

    to
    Woerden

    Zuilen

    Overvecht

    CTW

    to

    Depot

    LS

    21

    19

    15

    12

    9

    7

    4

    2

    Utrecht

    Centraal

    20

    18

    14

    11

    8

    5

    3

    1

    OZ

    Vaartsche

    Rijn

     
    to

     
    to
    Houten

    Driebergen

    Key

    fast lines

    connecting lines
    slow lines

    freight connection
    depots

     CTW
    LS OZ

    0

    platform numbers
    Source: [20]

    As the central hub of the Dutch railway network, disruptions at Utrecht Centraal can easily affect the rest of the country's railway network. 2–3 times per year, such disruptions led to a snowball effect, resulting in a total standstill of railway traffic in a wide area around Utrecht Centraal.[21][22][23]

    As part of a general effort to improve the reliability of the Dutch railway network and because of the High-Frequency programme (PHS) of the Dutch government, it was decided to remodel the track layout of the station, an investment of €270 million.[24]

    Reasons for the redesign

    [edit]

    The Ministry of Infrastructure described the reasons for the project as follows:[25]

    The problem of the old layout

    [edit]

    The main measures

    [edit]

    The goals

    [edit]

    The design: learning from Japan

    [edit]

    The idea for the new track layout was based on the layout of Shinagawa stationinTokyo. Based on Shinagawa and other Japanese examples,[26] a new design philosophy for track layout was developed within ProRail. It contains the following hierarchy:

    1. The main traffic flows are physically separated from each other (as far as possible within the given space) and have their own dedicated tracks.
    2. The layout of these tracks is optimized for speed and headways, this is the main function of the stations.
    3. Additional switches are added for reaching the depots. In the case of Utrecht, there are three depots and each platform track has access to at least one depot.
    4. As a last step, switches are added where necessary to enable traffic management in case of disruptions. These switches have to fulfill a number of conditions:
      • The switches for disruption management cannot compromise the main function.
      • Switches are only added for a fixed number of disruption scenarios (alternative platform track, complete or partial blockage of a line).
      • For each switch, a cost benefit analysis is made (including financial and operational aspects, such as delay minutes). Only switches with a positive result are included in the final design.

    The result

    [edit]

    The new layout has around 60 switches (compared to around 200 for the old layout) and results in a doubling of capacity.

    This capacity growth is due to the separating of the flows, the shorter headways and the extra platform. A part of this capacity growth is used for the implementation of the PHS High Frequency Programme, in which the basic frequency of several corridors is increased from 4 to 6 trains per hour. The station has capacity for a basic frequency of 8 trains per hour on all corridors, which makes it future proof for the foreseen growth up to 2040.[27]

    Train services

    [edit]

    International, national and local train services call at the station, most notably the Intercity-Express and NightJet trains to Germany, Switzerland and Austria, domestic Intercity services to all parts of the Netherlands, and local (Sprinter) services providing access to towns all over Utrecht province. Freight services also pass through the station, on the AmsterdamBetuwerouteRuhr corridor as well as the Antwerp – Northeast Germany corridor.

    The following passenger services call at Utrecht Centraal, adding up to around 70 departures per hour (2022 timetable):

    Tracks 1–4: Sprinter (local) services North & Northeast

    [edit]

    Tracks 5/7 and 18/19: Intercity / International services Northwest, South & East

    [edit]

    Tracks 8–12: Intercity services Northeast & West

    [edit]

    Tracks 14/15: Sprinter (local) services Northwest & East

    [edit]

    Tracks 20/21: Sprinter (local) services West & South

    [edit]

    Timetable

    [edit]

    The train services are scheduled in such a way, that there is a basic frequency of an Intercity and a Sprinter every 15 minutes in every direction from Utrecht Centraal. The Intercity trains on the routes Amsterdam – Utrecht, Schiphol – Utrecht, Utrecht – Arnhem and Utrecht – Eindhoven run every 10 minutes.

    Some services run only during the peak hour, but on most lines the basic frequency is offered all day. On Sunday mornings and late evenings some services do not run, but even during those times, there is always an Intercity and a Sprinter at least every 30 minutes in every direction.

    Bus services

    [edit]

    Utrecht Centraal has two bus stations. One on the east side of the railway station (Busstation Centrumzijde) and the other on the west side (Busstation Jaarbeurszijde). The majority of the bus services in and around the city is operated by Qbuzz under the U-OV brand. Syntus Utrecht (Keolis) and Arriva operate some of the regional bus services.

    Busstation Centrumzijde

    [edit]

    Busstation Jaarbeurszijde

    [edit]

    International bus services (Flixbus, Ecolines) call at a separate bus stop near the station.

    Tram services

    [edit]

    Utrecht Centraal has two light rail (sneltram) stops: Jaarbeursplein on the west side of the station, and Centrumzijde ("downtown side") on the east side of the station. There are three tram routes serving Utrecht Centraal:[16]

    On weekdays until 21:30, all three routes travel between Centrumzijde and P+R Science Park (in the Uithof district). In late evening, and on weekends or holidays, there is no service to P+R Science Park at which times tram routes 20 and 21 will terminate at Centrumzijde, and there is no tram 22 service.[16]

    Bicycles

    [edit]

    On both sides of the station, there is a large three-floor bicycle parking station. The parking on the east side is the world's largest bicycle parking station. It opened fully on the 19th of August 2019 at the cost of an estimated €48 million and holds 12,500 bicycles.[28]

    References

    [edit]
    1. ^ "Openbaar vervoer". utrecht-monitor.nl.
  • ^ "Dutch take cycling to a new level, with world's biggest multistorey bike park". the Guardian. 19 August 2019. Retrieved 24 March 2022.
  • ^ "Openbaar vervoer". utrecht-monitor.nl.
  • ^ "Nieuwe SleutelProjecten – Definitie op Infrasite.nl". www.infrasite.nl. Retrieved 15 June 2019.
  • ^ "Utrecht Central – Public transport terminal – CU2030". www.cu2030.nl. Retrieved 15 June 2019.
  • ^ "Reasons to build". CU2030. Retrieved 24 November 2014.
  • ^ "Public transport terminal". CU2030. Retrieved 24 November 2014.
  • ^ "Spot all the trains". Madurodam. Retrieved 15 June 2019.
  • ^ "Utrecht Trams Holland". The Aylesbury News. Retrieved 18 January 2020.
  • ^ "Sneltramhalte Utrecht Centraal begin december nieuwe begin-/eindhalte". Stationsgebied Utrecht – CU2030 (in Dutch). 6 November 2009. Archived from the original on 30 May 2012.
  • ^ "Nieuwe eindhalte tram op Jaarbeursplein geopend". Stationsgebied Utrecht – CU2030 (in Dutch). 23 April 2013. Archived from the original on 28 April 2015. Retrieved 26 January 2020.
  • ^ "Graafwerk bij tramhalte Jaarbeursplein Utrecht" (in Dutch). Regiotram Utrecht. 6 February 2020. Archived from the original on 3 March 2020. Retrieved 3 March 2020.
  • ^ "Verhuizing buslijnen Utrecht Centraal per 2 juli". Province of Utrecht (in Dutch). 1 July 2016. Archived from the original on 12 April 2018. Retrieved 27 January 2020.
  • ^ "Nieuw busstation Utrecht Centraal Centrumzijde open". RTV Utrecht (in Dutch). 9 December 2019. Retrieved 27 January 2020.
  • ^ "Utrecht (system map)". Urban Rail. 2019. Retrieved 18 January 2020.
  • ^ a b c d "Vanaf begin juli zonder overstap met de tram reizen" (in Dutch). RegioTram Utrecht. 22 June 2022. Archived from the original on 22 June 2022.
  • ^ "Veelgestelde vragen". Uithoflijn (in Dutch). City of Utrecht. Archived from the original on 20 January 2020. Retrieved 18 January 2020.
  • ^ "Haltebouw Jaarbeursplein Fast Forward" (in Dutch). RegioTram Utrecht. 18 September 2020. Archived from the original on 16 November 2020. Retrieved 15 November 2020.
  • ^ "Vernieuwde tramlijn 60 Utrecht-Nieuwegein/Zuid rijdt vanaf 3 januari" (in Dutch). RegioTram Utrecht. 28 December 2020. Archived from the original on 6 January 2021. Retrieved 5 January 2021.
  • ^ Utrecht Centraal
  • ^ "Treinverkeer Utrecht uren stil door storing". nos.nl.
  • ^ "Utrecht Centraal plat door winterweer". Treinreiziger.nl.
  • ^ "Treinverkeer Randstad ontregeld door storingen". Treinreiziger.nl. Archived from the original on 24 July 2011. Retrieved 12 March 2017.
  • ^ "270-miljoen-euro-om-spaghetti-van-sporen-utrecht-cs-te-ontwarren". ad.nl.
  • ^ Waterstaat, Ministerie van Infrastructuur en (23 May 2013). "Doorstroomstation Utrecht – Rapport – Rijksoverheid.nl". www.rijksoverheid.nl (in Dutch). Retrieved 19 June 2019.
  • ^ "Japan op Nederlands spoor: eenvoud loont" (PDF). micheljansen.org.
  • ^ "NMCA: tegen 2040 loopt het ov vast | OV-Magazine". www.ovmagazine.nl. Retrieved 19 June 2019.
  • ^ See: Utrecht to build world's biggest bike park – for 12,500 bikes, DutchNews.nl, Sunday 27 April 2014. Accessed on 28 April 2014.
  • [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Utrecht_Centraal_railway_station&oldid=1234505796"

    Categories: 
    Railway stations in Utrecht (city)
    Railway stations on the Centraalspoorweg
    Railway stations on the Rhijnspoorweg
    Railway stations on the Staatslijn H
    1843 establishments in the Netherlands
    Railway stations in the Netherlands opened in 1843
    Transit centers in the Netherlands
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    CS1 Dutch-language sources (nl)
    Articles with short description
    Short description matches Wikidata
    Use dmy dates from September 2015
    Coordinates on Wikidata
    Pages with Dutch IPA
    Commons category link is on Wikidata
     



    This page was last edited on 14 July 2024, at 18:17 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki