48°05′15″N 11°16′53″E / 48.087453°N 11.281474°E / 48.087453; 11.281474
This article needs additional citations for verification. Please help improve this articlebyadding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "German Space Operations Center" – news · newspapers · books · scholar · JSTOR (December 2019) (Learn how and when to remove this message) |
You can help expand this article with text translated from the corresponding article in German. (December 2019) Click [show] for important translation instructions.
|topic= will aid in categorization.Content in this edit is translated from the existing German Wikipedia article at [[:de:Deutsches Raumfahrt-Kontrollzentrum]]; see its history for attribution. {{Translated|de|Deutsches Raumfahrt-Kontrollzentrum}} to the talk page. |
The German Space Operations Center (GSOC; German: Deutsches Raumfahrt-Kontrollzentrum) is the mission control centerofGerman Aerospace Center (DLR) in Oberpfaffenhofen near Munich, Germany.
The GSOC performs the following tasks in national and international spaceflight:
After the Federal Republic of Germany decided in the 1960s to launch a national space program and to participate in international space projects, the idea of having its own space control center became concrete. In 1967, then Federal Minister of Finance Franz Josef Strauss laid the foundation stone for the first building complex, which was opened a little later.
Until 1985, the Oberpfaffenhofen site of the then German Aerospace Research and Testing Institute (DFVLR) increasingly concentrated on spaceflight. The human spaceflight received special attention. The GSOC then accompanied two crewed missions: During STS-61-A in 1985, GSOC took over the control of the Spacelab, while flight control continued from NASA's Lyndon B. Johnson Space Center was acquired. For the first time, the Payload Operation Control Center (POCC) of a US space mission was directed outside of NASA. For the first time, a human spaceflight was partially monitored from outside the USA or the Soviet Union.[1] During this mission, then Bavarian Prime Minister Franz Josef Strauss announced on 5 November 1985 an extensive investment program with which the role of Oberpfaffenhofen in European spaceflight should be increased.
The failure of Ariane 3 in 1985 and the Challenger disaster in 1986 slowed the development of the Oberpfaffenhofen and the GSOC. The investment program gave the GSOC a new building, Building 140. Construction began in April 1989.
In 1993, GSOC accompanied the entire operation with STS-55 and had full payload control via the Spacelab. This was the first time that there was unfiltered access to all data.