Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Location  





2 Overview  





3 Upgrading to tarmac  





4 Controversy  





5 See also  





6 References  





7 External links  














BuhimbaNalweyoKakinduBulamagi Road







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 01°0724N 31°1506E / 1.12333°N 31.25167°E / 1.12333; 31.25167
 

From Wikipedia, the free encyclopedia
 


Buhimba–Nalweyo–Kakindu–Bulamagi Road
Route information
Length32 mi (51 km)
HistoryDesignated in 2018
Upgrading expected completion in 2020
Major junctions
North endBuhimba
Major intersectionsNalweyo
Kakindu
South endBulamagi
Location
CountryUganda
Highway system

The Buhimba–Nalweyo–Kakindu–Bulamagi Road is a road in the Western RegionofUganda, connecting the town of Buhimba in Hoima District with the towns of Nalweyo, Kakindu and Bulamagi, in Kakumiro District.[1]

Location[edit]

The road starts at Buhimba, approximately 11 kilometres (7 mi), south of the city of Hoima, the capital of the sub-region.[2] The road runs in a general southern direction, crosses River Kafu to Nalweyo, in Kakumiro District. From Nalweyo, the road runs in a general southwesterly direction, through Kakindu to end at Bulamagi, a total distance of about 52 kilometres (32 mi).[3] The geographical coordinates of this road, immediately west of Nalweyo are: 01°07'24.0"N , 31°15'06.0"E (Latitude:1.123333; Longitude:31.251667).[4]

Overview[edit]

This road is one of the roads planned for upgrade and renovation as Uganda prepares the region for oil production, with first oil anticipated in 2021.[1][5]

Upgrading to tarmac[edit]

Prior to 2018, this road was gravel-surface in poor condition, with gullies and pot-holes. In January 2018, the Uganda National Roads Authority awarded the renovation contract to China Wuyi Industrial Company (CWIC). The work is funded with a US$50 million loan from Exim Bank of China.[1]

The upgrading of the road involved the conversion of the then existing gravel surface to tarmac and the building of bridges and drainage channels, bridges, intersections and related infrastructure. As of April 2018, the contractor was in the pre-construction mobilization stage.[1]

Controversy[edit]

In August 2018, the Uganda's Public Procurement and Disposal of Public Assets Authority (PPDA), halted the procurement of an engineering consultant for this road and for the connecting Bulamagi–Igayaza–Kakumiro Road, citing irregularities in the process. The procurement has to be re-advertised from the start.[6]

See also[edit]

References[edit]

  1. ^ a b c d ReportBuyer (April 2018). "UNRA: Buhimba–Nalweyo–Kakindu–Bulamagi Road Upgrade: Uganda: Project Profile" (Report ID: 5384346). ReportBuyer.Com. Retrieved 5 August 2018.[permanent dead link]
  • ^ Globefeed.com (5 August 2018). "Distance between Hoima, Uganda and Buhimba, Uganda". Globefeed.com. Retrieved 5 August 2018.
  • ^ Globefeed.com (5 August 2018). "Distance between Buhimba, Uganda and Bulamagi, Uganda". Globefeed.com. Retrieved 5 August 2018.
  • ^ Google (5 August 2018). "Location of the Buhimba–Nalweyo–Kakindu–Bulamagi Road" (Map). Google Maps. Google. Retrieved 5 August 2018.
  • ^ Kamoga, Jonathan (2 December 2017). "Oil Roads: UNRA Has Two Years To Deliver 600 Kilometers". The Observer (Uganda). Kampala. Retrieved 5 August 2018.
  • ^ Wesonga, Nelson (2 August 2018). "PPDA Blocks Recruitment of Contractor for Oil Road". Daily Monitor. Kampala. Retrieved 5 August 2018.
  • External links[edit]

    01°07′24N 31°15′06E / 1.12333°N 31.25167°E / 1.12333; 31.25167


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Buhimba–Nalweyo–Kakindu–Bulamagi_Road&oldid=1176277231"

    Categories: 
    Roads in Uganda
    Western Region, Uganda
    Kakumiro District
    Hoima District
    Hidden categories: 
    All articles with dead external links
    Articles with dead external links from October 2019
    Articles with permanently dead external links
    Pages using gadget WikiMiniAtlas
    Use dmy dates from August 2018
    EngvarB from August 2018
    Infobox road maps tracking category
    Infobox road instances in Uganda
    Coordinates on Wikidata
     



    This page was last edited on 20 September 2023, at 17:32 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki