Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Location  





2 Construction costs  





3 Completion  





4 See also  





5 References  





6 External links  














Kabalega Hydroelectric Power Station







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 01°3242N 31°0641E / 1.54500°N 31.11139°E / 1.54500; 31.11139
 

From Wikipedia, the free encyclopedia
 

(Redirected from Buseruka Power Station)

Kabalega Hydroelectric Power Station
Map
CountryUganda
LocationHoima
Coordinates01°32′42N 31°06′41E / 1.54500°N 31.11139°E / 1.54500; 31.11139
StatusOperational
Commission dateJanuary 2013
Power generation
Units operational3
Nameplate capacity9 MW (12,000 hp)

Kabalega Hydroelectric Power Station, also known as Kabalega Power Station is a 9 MW (12,000 hp) mini hydroelectric power project located across River Wambabya, in Buseruka Sub County, Hoima District, in Western Uganda.[1] At the beginning of planning and during construction, the power station was referred to as Buseruka Power Station, but was renamed after completion.[2]

Location[edit]

The power station is located in Buseruka Village, close to the eastern shores of Lake Albert. Buseruka is located approximately 37 kilometres (23 mi), by road, west of Hoima.[3]

Construction costs[edit]

The initial estimated cost for the dam and power plant was approximately US$30 million.[4] As time went on, that estimate was increased to US$36 million. The dam, power plant and 44 kilometres (27 mi) of high voltage transmission line from the power house to Kinubi Power SubstationinHoima, are being constructed by Hydromax, a private energy investor.[5] Funding for the project is facilitated by loans from the African Development Bank (US$9 million) and from the PTA Bank (US$10 million).[6]

Completion[edit]

Construction, which started in 2005, was completed in January 2013 and was commissioned by the president of Uganda, Yoweri Museveni, on 26 January 2013. At that time, the high voltage line which will evacuate the power generated to a substation that will integrate into the national grid, was yet to be completed.[7][8]

See also[edit]

  • iconWater portal
  • iconRenewable energy portal
  • References[edit]

    1. ^ Kasita, Ibrahim (29 September 2012). "Uganda Lacks Welders Artisans To Take Oil Jobs". New Vision. Archived from the original on 1 October 2012. Retrieved 5 May 2012.
  • ^ Mugerwa, Francis (28 August 2013). "Oil Gives Bunyoro A New Lease of Life". Daily Monitor. Retrieved 5 May 2014.
  • ^ "Road Distance Between Buseruka and Hoima with Map". Globefeed.com. Retrieved 5 May 2014.
  • ^ Atuhairwe, Robert (21 September 2011). "Hoima Power Dam Works End November 2011". New Vision. Archived from the original on 5 May 2014. Retrieved 5 May 2014.
  • ^ Kwesiga, Pascal (23 August 2009). "Hoima Plant To Supply Electricity". New Vision. Archived from the original on 5 May 2014. Retrieved 5 May 2014.
  • ^ Kasita, Ibrahim (19 April 2009). "AfDB Lends US$9 Million for Buseruka Power Dam". New Vision. Archived from the original on 5 May 2014. Retrieved 5 April 2014.
  • ^ Brian Mayanja, Pascal Kwesiga and Robert Atuhairwe (26 January 2013). "Museveni Launches Hoima Power Plant". New Vision. Retrieved 5 May 2014.
  • ^ Kalyango, Ronald (25 January 2013). "Buseruka Dam to Supply Power to 1,000 Homes". New Vision. Retrieved 5 May 2014.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Kabalega_Hydroelectric_Power_Station&oldid=964402980"

    Categories: 
    Energy infrastructure completed in 2013
    Hydroelectric power stations in Uganda
    Hoima District
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    All articles with dead external links
    Articles with dead external links from February 2020
    Articles with permanently dead external links
    Pages using the Kartographer extension
     



    This page was last edited on 25 June 2020, at 08:55 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki