Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Location  





2 Overview  





3 Construction costs  





4 See also  





5 References  





6 External links  














Nzizi Thermal Power Station







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 01°3116N 30°5805E / 1.52111°N 30.96806°E / 1.52111; 30.96806
 

From Wikipedia, the free encyclopedia
 

(Redirected from Nzizi Power Station)

Nzizi Thermal Power Station
Map
Nzizi Thermal Power Station
CountryUganda
LocationNzizi
Coordinates01°31′16N 30°58′05E / 1.52111°N 30.96806°E / 1.52111; 30.96806
StatusPlanned
Commission dateTo be determined
Owner(s)Tullow Oil & Jacobsen Electro
Thermal power station
Primary fuelNatural gas
Secondary fuelHeavy fuel oil
Power generation
Nameplate capacity100 MW (130,000 hp)

Nzizi Power Station is a planned 100 MW (130,000 hp) natural gas-fired thermal power plant in Uganda.[1]

Location[edit]

The power plant is planned to be constructed in Nzizi, near the Nzizi Natural Gas & Oil Field, in the Kaiso-Tonya Area in Hoima District in the Western Region of Uganda. Kaiso and Tonya are small settlements, about 15 kilometres (9.3 mi) apart, on the eastern shores of Lake Albert.[2] This is approximately 61 kilometres (38 mi) by road, west of Hoima, the nearest large town and the location of the district headquarters.[3] The approximate coordinates of the power station are 1°31'16.0"N, 30°58'05.0"E (Latitude:1.521104; Longitude:30.968047). The coordinates are approximate because the power station has not been built yet.[4]

Overview[edit]

The power station is a planned joint project by Tullow Oil Uganda Limited, who will supply the fuel, and Jacobsen Electricity Company (Uganda) Limited, a wholly owned subsidiary of Jacobsen Elektro AS, an independent Norwegian power production company, who will construct and operate the plant.[5]

The plant will primarily use natural gas to heat water and produce steam that will turn the turbines to produce electricity. If need be, the plant will also be designed to use heavy fuel oil, a byproduct of petroleum distillation, as an alternative fuel. The Nzizi Natural Gas & Oil Field, from which the power station will draw its fuel, has confirmed natural gas reserves of at least 14,000,000 cubic metres (490,000,000 cu ft).[6] The power generated will be evacuated along a 132 kilovolt transmission line to a substation in Hoima, where the power will be integrated into the national power grid. According to Uganda's government officials, construction is expected to commence in 2016 and last 10 months, with commissioning in 2017.[7][8]

Construction costs[edit]

The total cost for the power plant is estimated at US$170 million (UGX:436.9 billion). Of that, US$25.5 million (UGX:65.5 billion) representing 15 percent of the total, will be contributed by the Ugandan government.[9]

See also[edit]

References[edit]

  1. ^ OIU (2 July 2013). "Gas: Not The Main Meal But A Useful Side Dish". Kampala: Oilinuganda.org (OIU). Retrieved 22 April 2016.
  • ^ GFC (22 April 2016). "Distance between Kaiso, Western Region, Uganda and Tonya, Western Region, Uganda". Globefeed.com (GFC). Retrieved 22 April 2016.
  • ^ GFC (22 April 2016). "Distance between Hoima, Western Region, Uganda and Kaiso, Western Region, Uganda". Globefeed.com (GFC). Retrieved 22 April 2016.
  • ^ Tullow Oil (28 July 2011). "Map Showing Location of Nzizi Gas & Oil Field". Tullow Oil. Retrieved 9 June 2014.
  • ^ Haywood, Katherine (17 March 2010). "Norwegians to build power plant in Hoima". Daily Monitor. Kampala. Retrieved 22 April 2016.
  • ^ Musisi, Frederic (4 June 2013). "What Lies Ahead for Uganda's Gas". Daily Monitor. Kampala. Retrieved 9 June 2014.
  • ^ Mbanga, Jeff (28 May 2014). "Norwegian Energy Firm Interested In Uganda's Gas Reserves". Deep Earth International. Retrieved 9 June 2014.
  • ^ Wesonga, Nelson (15 December 2014). "Uganda Looks To Increase Use of Thermal Electricity". Daily Monitor. Kampala. Retrieved 16 December 2014.
  • ^ Wesonga, Nelson (9 June 2014). "Norwegian company to build 100MW power plant in Hoima". Daily Monitor. Retrieved 9 June 2014.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Nzizi_Thermal_Power_Station&oldid=1181329874"

    Categories: 
    Natural gas-fired power stations in Uganda
    Proposed power stations in Uganda
    Hoima District
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Thermal power station articles using Infobox power station
    Pages using the Kartographer extension
     



    This page was last edited on 22 October 2023, at 10:51 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki