Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  Initial plans  





1.2  19551979: Beginning of operations  





1.3  19801989: Initial expansion  





1.4  19901999: Rapid expansion to accommodate Expo '98  





1.5  20012016: Continued expansion  





1.6  2017present  



1.6.1  Proposed extensions  







1.7  Timeline  







2 Lines  



2.1  Map  







3 Operation  



3.1  Operating hours and frequency  





3.2  Ticketing and fares  







4 Rolling stock  



4.1  Current  





4.2  Former  







5 Art  





6 See also  





7 References  





8 External links  














Lisbon Metro







Беларуская
Беларуская (тарашкевіца)
Català
Čeština
Deutsch
Español
Esperanto
Euskara
فارسی
Français
Galego

Bahasa Indonesia
Italiano

Latina
Magyar
Nederlands

Oʻzbekcha / ўзбекча
Polski
Português
Română
Русский
Simple English
Suomi
Svenska
Татарча / tatarça

Türkçe
Українська


 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Lisbon Metro
Overview
Native nameMetro de Lisboa
OwnerGovernment-owned corporation
LocaleLisbon-Amadora-Odivelas-Loures, Portugal
Transit typeRapid transit
Number of lines4[1]
Number of stations56[1]
Daily ridership473,972 (2019 daily average)
Annual ridership173.00 million (2019)[2]
Websitewww.metrolisboa.pt
Operation
Began operation29 December 1959; 64 years ago (1959-12-29)
Operator(s)Metropolitano de Lisboa, EPE
Number of vehicles113 3-car trainsets
HeadwayPeak hours: 3–5 minutes[3]
Off-peak: 5–10 minutes[3]
Technical
System length44.5 km (27.7 mi)[1]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Top speed60 km/h (37 mph)
System map

Aeroporto  Red 

Encarnação
 Blue  Reboleira

Moscavide
Amadora Este

Oriente
Alfornelos

Cabo Ruivo
Pontinha

Olivais
Carnide

Chelas
Colégio Militar/Luz

Bela Vista
Alto dos Moinhos

Olaias
Laranjeiras

Odivelas  Yellow 
Jardim Zoológico

Senhor Roubado
Praça de Espanha

Ameixoeira
Parque

Lumiar
 Green  Telheiras

Quinta das Conchas

Campo Grande
Cidade Universitária

Alvalade
Entre Campos

Roma
Campo Pequeno

Areeiro

Alameda
 Red  São Sebastião

Saldanha
Picoas

Arroios
Marquês de Pombal

Anjos
 Yellow  Rato

Intendente
Avenida

Martim Moniz
Restauradores

Rossio
Baixa-Chiado

 Green  Cais do Sodré

Terreiro do Paço

Santa Apolónia  Blue 
  • talk
  • edit
  • The Lisbon Metro (Portuguese: Metro de Lisboa) is a rapid transit system in Lisbon, Portugal. Opened in December 1959,[4] it was the first rapid transit system in Portugal, and to date is the only rapid transit system in Portugal. As of 2023, the system's four lines total 44.5 kilometres (27.7 mi) of route and serve 56 stations.[1]

    History[edit]

    Initial plans[edit]

    Evolution of the Lisbon Metro, 1959–2012

    The idea of building a system of underground railways for the city of Lisbon first arose in 1888. It was first proposed by Henrique de Lima e Cunha, a military engineer who had published a proposal in the journal Obras Públicas e Minas (Public Works and Mines) for a network with several lines that could serve the Portuguese capital. Concrete plans took longer to evolve, though. Lanoel Aussenac d'Abel and Abel Coelho presented theirs in 1923, and José Manteca Roger and Juan Luque Argenti theirs one year later, in 1924. None of these plans were carried out.[5]

    After World War II, in which Portugal remained neutral, the national economy took off and the financial possibilities arising from the Marshall Plan provided a strong boost to the potential construction of a metro in Lisbon. A society was formed on 26 January 1948 with the purpose of studying the technical and economic feasibility of the project.[5]

    1955–1979: Beginning of operations[edit]

    Lisbon Metro network in 1959, when it was inaugurated.
  • Lisbon Metro network in 1963, after completion of the connection between Restauradores and Rossio stations.
    Lisbon Metro network in 1963, after completion of the connection between Restauradores and Rossio stations.
  • Lisbon Metro network in 1966, after completion of the Rossio–Anjos segment.
    Lisbon Metro network in 1966, after completion of the Rossio–Anjos segment.
  • Lisbon Metro network in 1972, after completion of the Anjos–Alvalade segment.
    Lisbon Metro network in 1972, after completion of the Anjos–Alvalade segment.
  • Old Lisbon Metro logo at Colégio Militar/Luz station

    Construction began on 7 August 1955, and four years later, on 29 December 1959, the Lisbon Metro was inaugurated. The network was formed by a Y-shaped line linking Restauradores to Rotunda (now Marquês de Pombal), branching then to Entre Campos and to Sete Rios (now Jardim Zoológico), where the rolling stock depot (PMO I) which was also linked to the outer-loop Cintura LineofCP was located. Two services were operated on the system: one between Restauradores and Sete Rios (which later became part of the Blue Line), and one between Restauradores and Entre Campos (which later became part of the Yellow Line).

    The new system was well received by the public, and in the first year the Metro carried more than 15.3 million passengers. The metro has proved an important factor in urban development of the city, outlining new areas of housing and services. On 27 January 1963, the first phase of the central portion of the network (later the Green Line) opened with an extension from Restauradores to Rossio; the second phase (from Rossio to Anjos) opened on 28 September 1966 and the third phase (from Anjos to Alvalade) opened on 18 June 1972.

    After this first extension, no further extensions began construction until the early 1980s. In 1974, after the Carnation Revolution, the management model was changed, being nationalized in 1975 and renamed Metropolitano de Lisboa, EP in 1978. Under the new management, works were carried to enlarge platforms, originally designed to receive two cars, so that these could receive four cars.[5]

    1980–1989: Initial expansion[edit]

    Lisbon Metro network in October 1988, after the extensions from Jardim Zoológico to Colégio Militar/Luz and Entre Campos to Cidade Universitária were completed.
    Lisbon Metro train at the Green Line Telheiras station.

    In the 1980s, additional extensions to the metro network began to be studied. An extension from Alvalade to Calvanas was planned to begin construction in 1980 and the extension from Sete Rios to Colégio Militar (later Colégio Militar/Luz) was expected to begin construction in 1982.

    In 1984, works began to extend the eastern branch of the initial line from Entre Campos to Campo Grande (then called Cruz Norte). At the same time, construction of the extension from Alvalade to Campo Grande began; plans to build a station at Calvanas, near the Júlio de Matos hospital, had already been abandoned at the time.

    By the end of the decade, on 14 October 1988, the extension connecting Sete Rios to Colégio Militar/Luz was inaugurated, opening three stations: Laranjeiras, with artwork by Sá Nogueira, Alto dos Moinhos (artwork by Júlio Pomar), and Colégio Militar/Luz (artwork by Manuel Cargaleiro). Cidade Universitária (connected to the main campus of the University of Lisbon, with artwork by Maria Helena Vieira da Silva) opened at the same time, as part of the extension from Entre Campos to Campo Grande. These four stations were the first to be built from scratch with platforms long enough to receive six cars (105 metres (344 ft 6 in)) and with artwork in the platforms themselves.[5]

    1990–1999: Rapid expansion to accommodate Expo '98[edit]

    Lisbon Metro network in April 1993, after completion of the Campo Grande–Alvalade and Campo Grande–Cidade Universitária segments.
  • Lisbon Metro network in July 1995, when the segment between Campo Grande and Rotunda became part of the Yellow Line.
    Lisbon Metro network in July 1995, when the segment between Campo Grande and Rotunda became part of the Yellow Line.
  • Lisbon Metro network in December 1997, when the Rotunda–Rato segment of the Yellow Line was completed.
    Lisbon Metro network in December 1997, when the Rotunda–Rato segment of the Yellow Line was completed.
  • Lisbon Metro network in November 1998, when the Campo Grande-Rossio segment was extended to Cais do Sodré and became part of the Green Line, and the initial segment of the Red Line (between Alameda and Oriente) was completed; the Blue Line was extended to Baixa-Chiado to provide a transfer point with the Green Line after the Restauradores–Rossio connection was removed from regular service.
    Lisbon Metro network in November 1998, when the Campo Grande-Rossio segment was extended to Cais do Sodré and became part of the Green Line, and the initial segment of the Red Line (between Alameda and Oriente) was completed; the Blue Line was extended to Baixa-Chiado to provide a transfer point with the Green Line after the Restauradores–Rossio connection was removed from regular service.
  • Bela Vista station (Red Line).
    Picoas station (Yellow Line).
    Roma station (Green Line).

    In 1990, the Network Expansion Plan was presented, which included extensions from Rossio to Cais do Sodré and from Restauradores to Baixa-Chiado, splitting the Y in Rotunda (extending the branch from Picoas to a new station, Rato) and the extension Colégio Militar/Luz–Pontinha (including a new depot near the Pontinha station, PMO III).

    In 1991, the first prototype of the ML90 car series was presented, consisting of two triple units (motor-trailer-motor) of six cars (with the first unit being numbered M-201, R-202 and M-203), built by Sorefame/Bombardier. These cars had a digital destination sign, were generally more comfortable and could operate with or without the trailer. The motor cars in these two triple units were also the only ones to have a front door to the cab, which was not included in further batches.

    On 3 April 1993, the elevated Campo Grande station opened, along with the expansions Alvalade–Campo Grande and Cidade Universitária–Campo Grande. With this extensions, the network grew 5.0 km (3.1 mi). In the same month, the ML90 prototype cars were used for the first time.

    In 1993, the second Network Expansion Plan was presented, intended to serve Expo '98. It recommended that the Metro should operate the following routes by 1999:

    The PMO II depot at Campo Grande was finished in the autumn of 1994 after eleven years of works. At the end of this year, the second batch of ML90 was ordered, consisting of 17 triple units (or 51 cars). On 15 July 1995, the two services were finally realigned into Line A (blue) between Colégio Militar/Luz and Campo Grande via Rossio, and Line B (yellow) between Campo Grande and Rotunda. The old Rotunda station (now Rotunda I) was extended from 75 to 105 metres and totally refurbished, while the new station (Rotunda II) already had a platform with 105 metres.

    By the end of 1996, the second batch of ML 90 (numbered M-207 to M-257) was ready; colors and materials used in this second batch differed somewhat from that made up the first. The rolling stock was now composed of 191 coaches: 80 of them ML7, 54 ML90 and 57 ML79. On 18 October 1997, the Blue Line expansion from Colégio Militar/Luz to Pontinha opened, expanding the network by 1.6 km (0.99 mi). In December of the same year, Rato opened, 0.6 km (0.37 mi) from Rotunda II. Orders for new rolling stock continued in 1997, when half of the cars now known as ML95 were delivered (19 electric triple units, motor-trail-motor, or 57 cars). These new coaches, which look similar to ML90, have some technical differences, like a different engine and electrical door control (unlike the pneumatic control used on its predecessors). The new logo of the Lisbon Metro was first inserted into these new coaches.

    1998 was a year when most of the said expansion projects were completed; as early as March the names of four stations had changed:

    In March 1998, the section between Rossio and Campo Grande became part of the Green Line, which removed the connection between Restauradores and Rossio stations from regular service. On 18 April, the section Rossio - Cais do Sodré (1.4 km (0.87 mi)) was opened, with two stations: Baixa-Chiado and Cais do Sodré, the latter connecting to the train and boat stations.

    The Red Line (Line D at the time) would be inaugurated on 19 May 1998, three days before the opening of Expo '98. This line was 5 km (3.1 mi) long and included five new stations: Alameda II, Olaias, Bela Vista, Chelas, and Oriente; the line began running six car trains beginning in June of that year on an experimental basis in order to satisfy the demand of passengers visiting Lisbon during Expo '98. By this time, the entire ML95 series had been delivered, numbered M-301 to M-414.

    Later in 1998, Cabo Ruivo (on 18 July) and Olivais (on 8 August) opened as infill stations on the Red Line, between Chelas and Oriente. The rolling stock was then composed of 305 cars – 80 ML7, 54 ML79, 57 ML90 and 114 ML95, and the network comprised 40 stations.

    In 1999, the PMO III depot opened near the Pontinha station, replacing the old PMO I depot at Sete Rios, in an event where the prototype of the future car series (now known as ML97) was presented, which would consist of 18 articulated triple units (54 cars). The main difference from the previous series was the possibility of free movement between each car. In addition, the prototype had a more modern image, and also introduced digital automatic passenger information. According to the operator, the trailer of these triple units can be removed, although this has never been witnessed. The first cars were issued during 1999, numbered M-501 to M-554. The rolling stock, at the turn of the millennium, was made of 361 cars of five train types (80 ML7, 54 ML79, 57 ML90, 114 ML95, 54 ML97), the largest number of train cars to date before the retirement of the ML7 and ML79 series in 2000 and 2002, respectively.

    2001–2016: Continued expansion[edit]

    Lisbon Metro network in January 2003, after the Telheiras–Campo Grande segment of the Green Line was completed.
  • Lisbon Metro network in May 2004, after the Pontinha–Amadora Este segment of the Blue Line and the Campo Grande–Odivelas segment of the Yellow Line opened.
    Lisbon Metro network in May 2004, after the Pontinha–Amadora Este segment of the Blue Line and the Campo Grande–Odivelas segment of the Yellow Line opened.
  • Lisbon Metro network in December 2007, after the Baixa-Chiado–Santa Apolónia segment of the Blue Line opened.
    Lisbon Metro network in December 2007, after the Baixa-Chiado–Santa Apolónia segment of the Blue Line opened.
  • Lisbon Metro network in December 2009, after the Alameda–São Sebastião segment of the Red Line opened.
    Lisbon Metro network in December 2009, after the Alameda–São Sebastião segment of the Red Line opened.
  • Lisbon Metro network in July 2012, after the Oriente–Aeroporto segment of the Red Line opened.
    Lisbon Metro network in July 2012, after the Oriente–Aeroporto segment of the Red Line opened.
  • Lisbon Metro network in June 2016, after the Amadora Este–Reboleira segment of the Blue Line opened.
    Lisbon Metro network in June 2016, after the Amadora Este–Reboleira segment of the Blue Line opened.
  • Terreiro do Paço station atrium (Blue Line).
    Terreiro do Paço station (Blue Line).
    Santa Apolónia station (Blue Line).

    On 2 November 2002, under Manuel Frasquilho's tenure as president, the Green Line's extension from Campo Grande to Telheiras opened. In 2004, the network opened its first extensions outside the geographical limits of the city: first, in March, with the expansion of the Yellow Line from Campo Grande to Odivelas (which included five new stations, two of which are aboveground); then, in May, the Blue Line was extended from Pontinha to Amadora Este. Later that year, construction of the Red Line segment between Alameda and São Sebastião began.

    On 19 December 2007, after 11 years of construction, the final 2.2 km (1.4 mi)-long section of the Blue Line between Baixa-Chiado and Santa Apolónia opened, with some controversy and many successive delays due to the difficulty of construction. The segment was originally slated to open in 2001, but in 2000, cracks were discovered in the original tunnel that led to land subsidence. The consequent flooding of the tunnel seriously slowed down the completion of work and road traffic at the Praça do Comércio and part of the Avenida Infante D. Henrique was forced to be closed temporarily while the new tunnel was constructed in its place. The stations themselves (Terreiro do Paço and Santa Apolónia) were completed in the summer of 2007.

    On 29 August 2009, the Red Line section between Alameda II and São Sebastião II was inaugurated, such that all lines now cross each other.

    On 17 July 2012, the Red Line was extended between Oriente and Aeroporto, adding 3.3 km (2.1 mi) to the network. Three new stations have been inaugurated: Moscavide, Encarnação and Aeroporto, which is directly linked to the Lisbon Portela Airport. A journey from the central Saldanha station to the Lisbon Airport now only lasts about 16 minutes. The Red Line also serves the Moscavide neighbourhood, and was expected to carry 400,000 extra passengers each year.[6]

    The Blue Line segment between Amadora Este and Reboleira on the Blue Line opened on 17 April 2016, twelve years after the initial portion of the segment between Pontinha and Amadora Este was completed.[7]

    2017–present[edit]

    Further modernization works to the Lisbon Metro began on 19 July 2017, when the Arroios station on the Green Line was closed for extensive renovations and the expansion of the platforms to allow six-car trains; the station was originally scheduled to reopen in 2019, but reopening was later postponed to no earlier than 2021 due to construction delays. The renovated station finally reopened in September 2021. On 8 June 2018, portions of the platform edges at the Encarnação station on the Red Line partially collapsed onto the tracks, which necessitated a week-long closure of the segment between the Moscavide and Aeroporto stations.[8] For the last two years of the 2010s, the metro's ridership growth began to slow as a result of economic concerns; after years of steady growth, ridership increased from 169 million passengers in 2018 to 173 million passengers in 2019 before it began to decline in 2020 as a result of the COVID-19 pandemic.[9]

    On 29 September 2020, portions of the tunnel near the Praça de Espanha station on the Blue Line collapsed while the station was undergoing renovation works, necessitating a temporary closure of the line between Laranjeiras and Marquês de Pombal stations.[10]

    Proposed extensions[edit]

    Proposed map of the network.

    On 8 May 2017, the government of Portugal announced an extension of the Yellow Line to Cais do Sodré as part of a new operational master plan. The extension, which will connect the Yellow Line with the Green Line and is expected to open in 2024, will contain two new stations at Estrela and Santos; Campo Grande will also be reconstructed as part of the project. Construction on this extension began on 16 April 2021.[11][12] Once the extension is placed into service, the Green and Yellow lines will be reorganised: the Green Line will run as a circular route and will take over the section of the Yellow Line between Campo Grande and Rato.[13] With this change, the Yellow Line is proposed to extend from Telheiras to Benfica.[14] This extension has been opposed by several groups, including the government of Odivelas and the PSD; the latter proposed a bill to the government in July 2019 that would call for the suspension of the project in favour of a metro extension into Loures.[15][16]

    An extension to the Red Line is also projected to be built, extending it to four entirely new stations: Campolide/Amoreiras, Campo de Ourique, Infante Santo and Alcântara. The project, if it goes forward, is projected to be completed by around 2026.[17]

    A new line, the Violet Line, is also projected to be constructed in the coming years. Unlike the rest of the Metro, this line would not be heavy rail, nor mostly underground, but rather surface light rail. It will connect the area of Infantado, in Loures to the metro station of Odivelas and then to Beatriz Ângelo Hospital, with the line making a "C" shape. It is planned to be completed by around 2025.[17]

    Timeline[edit]

    Lines[edit]

    Map of Lisbon Underground with all planned future expansions.

    The Lisbon Metro comprises four lines running on 44.5 kilometres (27.7 mi) of route and serving 56 stations.[1] The lines were formerly known by picturesque names; logos based on the former names are still used. These picturesque names are still used as secondary names.

    Colour Name Termini Stations Length History
    Linha Azul
    Blue Line

    Linha da Gaivota
    Seagull Line
    Santa Apolónia
    Reboleira
    18 14 km (8.7 mi)

    1959: Sete Rios (now Jardim Zoológico) – Restauradores

    1988: Sete Rios (now Jardim Zoológico) – Colégio Militar/Luz
    1997: Colégio Militar/LuzPontinha
    1998: Restauradores - Baixa-Chiado (Blue and Green Lines split)
    2004: Pontinha – Amadora Este
    2007: Baixa-Chiado – Santa Apolónia

    2016: Amadora Este – Reboleira

    Linha Amarela
    Yellow Line

    Linha do Girassol
    Sunflower Line
    Rato
    Odivelas
    13 11 km (6.8 mi)

    1959: Entre Campos – Rotunda (now Marquês de Pombal)

    1988: Entre Campos – Cidade Universitária
    1993: Cidade Universitária – Campo Grande
    1997: Rotunda (now Marquês de Pombal) – Rato

    2004: Campo Grande – Odivelas

    Linha Verde
    Green Line

    Linha da Caravela
    Caravel Line
    Cais do Sodré
    Telheiras
    13 9 km (5.6 mi)

    1963: Restauradores – Rossio

    1966: Rossio - Anjos
    1972: Anjos - Alvalade
    1993: Alvalade – Campo Grande
    1998: Rossio – Cais do Sodré
    (Blue and Green lines split)

    2002: Campo Grande – Telheiras

    Linha Vermelha
    Red Line

    Linha do Oriente
    Orient Line
    São Sebastião
    Aeroporto
    12 11.5 km (7.1 mi)

    1998: Alameda – Oriente

    2009: Alameda (II) – São Sebastião (II)

    2012: Oriente – Aeroporto

    Map[edit]

    Map


    Operation[edit]

    Operating hours and frequency[edit]

    Metro service starts every day at 06:30 and stops at 01:00 (the last trains arrive at the terminal stations by 01:30). However, some station exits close before 01:00. Trains run at a 5–8 minutes headway.

    Ticketing and fares[edit]

    Viva Viagem cards (2014)

    There are two methods of payment:

    Both cards can also be used on other modes of transport like Fertagus, CP (including its suburban rail service) and the Transtejo & Soflusa ferry service.

    Rolling stock[edit]

    Current[edit]

    Currently, four types of trains are in service on the Lisbon Metro. Unlike most metro systems, the trains do not have any form of air conditioning due to the small size of the tunnels.

    Former[edit]

    Art[edit]

    The architecture and decor of an underground station is a key element for the well-being of passengers, and art works to make travel more appealing. Lisbon Metro is one of the various underground systems in the world where art is best represented, much like the Munich U-Bahn in Germany, Moscow Metro in Russia, Montreal Metro in Canada and the Stockholm metro in Sweden. From the beginning, there was a concern to make a smooth visual transition between surface and underground. Architect Francisco Keil do Amaral (1910–1975) designed a station model, which was used as a template for all stations built until 1972. In this model, the decor was very moderate, with smooth but firm lines, much like the Portuguese political regime at the time. The original eleven stations, except Avenida, had artwork by his wife, painter Maria Keil (1914–2012).

    In 1988, with the completion of new expansions, there was still a concern about organizing and decorating stations, thus these stations featured works by contemporary Portuguese artists: Rolando de Sá Nogueira in Laranjeiras, Júlio Pomar in Alto dos Moinhos, Manuel Cargaleiro in Colégio Militar/Luz, and Vieira da Silva in Cidade Universitária.

    Since then, art has become the norm in the Lisbon Metro; lighting plays with the brightness of the azulejo tiles that are present in almost every station. In recent years, the oldest stations have been refurbished, not only to enhance the decor and aesthetics, but also to improve accessibility for passengers with reduced mobility. Parque station is generally considered to be the most valuable and interesting of them all, where the tiles map details of the Portuguese voyages of discovery and their philosophical and literary links.

    See also[edit]

    References[edit]

    1. ^ a b c d e "O Metro em números" [The Metro in numbers – Network evolution] (in Portuguese). Metropolitano de Lisboa, E.P.E. Retrieved 1 September 2023.
  • ^ "Metro de Lisboa tem novo ano recorde. Empresa transportou 173 milhões de passageiros em 2019" [Lisbon Metro has a new record year. Company transported 173 million passengers in 2019] (webpage) (in Portuguese). Jornal Económico. 2020. Retrieved 27 January 2020.
  • ^ a b "Intervalo entre comboios" [Time between vehicles] (in Portuguese). Metropolitano de Lisboa, E.P.E. Archived from the original on 31 December 2016. Retrieved 30 December 2016.
  • ^ "A brief history". Metro Lisboa. Retrieved 16 November 2023.
  • ^ a b c d "Um pouco de história". metrolisboa.pt (in Portuguese). Archived from the original on 5 February 2018.
  • ^ "Prolongamento ao Aeroporto | Abertura ao Público". metrolisboa.pt (in Portuguese). 16 July 2012. Archived from the original on 17 July 2012.
  • ^ "Ligação do metro de Lisboa à Linha de Sintra é inaugurada na quarta". Notícias ao Minuto (in Portuguese). 11 April 2016.
  • ^ Neves, Sofia (14 June 2018). "Lisboa. Estação Aeroporto do Metro de Lisboa reabre esta sexta-feira". PÚBLICO (in Portuguese).
  • ^ "Passageiros transportados em 2018" (PDF). 7 January 2019.
  • ^ "Metro de Lisboa: Desabamento leva a interrupção da linha azul, e faz quatro feridos. Saiba que troços da linha estão em funcionamento" (in Portuguese). SAPO 24. 29 September 2020.
  • ^ Pincha, João Pedro (14 April 2021). "Linha circular do Metro de Lisboa já está em obras". PÚBLICO (in Portuguese). Retrieved 16 April 2021.
  • ^ Marques Alves, Joana (19 August 2019). "Afinal, linha circular do Metro de Lisboa só abre em 2024". Sol (in Portuguese). Retrieved 24 August 2019.
  • ^ "Ligação do Rato ao Cais do Sodré dá linha circular a metro de Lisboa". Público (in Portuguese). 8 May 2017. Retrieved 10 May 2017.
  • ^ Pessoas, Lisboa Para; André, Mário Rui (20 March 2023). "Mapa da expansão do Metro de Lisboa mostra Linha Amarela até Benfica". Lisboa Para Pessoas (in European Portuguese). Retrieved 26 September 2023.
  • ^ "AR aprova por recomendações para expandir metro de Lisboa para Loures". RTP Notícias (in Portuguese). 19 July 2019. Retrieved 6 August 2019.
  • ^ Ferro, Carlos (18 July 2019). "Deputados querem suspensão da Linha Circular em Lisboa e defendem metro até Loures". Diário de Notícias (in Portuguese). Retrieved 6 August 2019.
  • ^ a b "Projetos em Estudo - Metro de Lisboa" (in Portuguese). Retrieved 10 October 2022.
  • ^ Reboleira extension to open on April 7, 2016, portugalferroviario.net, 3 March 2016.
  • ^ Work in Reboleira underground station suspended Archived 2012-04-21 at the Wayback Machine, publico.pt, 27 January 2012.
  • ^ Underground: opening of Reboleira station delayed to 2014, Visão, visao.sapo.pt, 27 January 2012.
  • ^ Empreendimento Reboleira Archived 2012-07-07 at the Wayback Machine, Metro Lisboã, metrolisboa.pt, 16 July 2012.
  • External links[edit]

    Media related to Lisbon Metro at Wikimedia Commons


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Lisbon_Metro&oldid=1224917030"

    Categories: 
    Lisbon Metro
    Transport in Lisbon
    Rapid transit in Portugal
    Underground rapid transit in Portugal
    750 V DC railway electrification
    Álvaro Siza Vieira buildings
    Modernist architecture in Portugal
    Railway lines opened in 1959
    1959 establishments in Portugal
    Hidden categories: 
    CS1 Portuguese-language sources (pt)
    CS1 European Portuguese-language sources (pt-pt)
    Webarchive template wayback links
    Articles with short description
    Short description is different from Wikidata
    Use dmy dates from August 2019
    Articles containing Portuguese-language text
    Articles containing potentially dated statements from 2023
    All articles containing potentially dated statements
    Commons category link is on Wikidata
    Articles with VIAF identifiers
    Articles with SUDOC identifiers
    Pages using the Kartographer extension
     



    This page was last edited on 21 May 2024, at 07:57 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki