Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Crew  



1.1  Crew seating arrangements  







2 Preparations and launch  





3 Mission highlights  





4 Mission insignia  





5 Wake-up calls  





6 See also  





7 References  





8 External links  














STS-43






العربية
 / Bân-lâm-gú
Български
Čeština
Dansk
Deutsch
فارسی
Français
Galego
Italiano
עברית
Magyar
Nederlands

Norsk nynorsk
Polski
Português
Русский
Slovenčina
Svenska
Українська
Yorùbá

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


STS-43
Atlantis deploying TDRS-E.
NamesSpace Transportation System-43
Mission typeTDRS-E satellite deployment
Technology
OperatorNASA
COSPAR ID1991-054A Edit this at Wikidata
SATCAT no.21638
Mission duration8 days, 21 hours, 21 minutes, 25 seconds
Distance travelled5,955,217 km (3,700,400 mi)
Orbits completed142
Spacecraft properties
SpacecraftSpace Shuttle Atlantis
Launch mass117,650 kg (259,370 lb)
Landing mass89,239 kg (196,738 lb)
Payload mass21,067 kg (46,445 lb)
Crew
Crew size5
Members
  • Michael A. Baker
  • Shannon Lucid
  • G. David Low
  • James C. Adamson
  • Start of mission
    Launch dateAugust 2, 1991, 15:01:59 UTC
    RocketSpace Shuttle Atlantis
    Launch siteKennedy Space Center, LC-39A
    ContractorRockwell International
    End of mission
    Landing dateAugust 11, 1991, 12:23:25 UTC
    Landing siteKennedy Space Center,
    SLF Runway 15
    Orbital parameters
    Reference systemGeocentric orbit
    RegimeLow Earth orbit
    Perigee altitude301 km (187 mi)
    Apogee altitude306 km (190 mi)
    Inclination28.46°
    Period90.60 minutes
    Instruments
    • Optical Communications Through Windows (OCTW)
  • Solid Surface Combustion Experiment (SSCE)
  • Space Station Heat Pipe Advanced Radiator Element (SHARE II)
  • Shuttle Solar Backscatter Ultra-Violet (SSBUV)
  • Tank Pressure Control Equipment (TPCE)

  • STS-43 mission patch

    Shannon Lucid, James C. Adamson, John E. Blaha, G. David Low, Michael A. Baker
    ← STS-40 (41)
    STS-48 (43) →
     

    STS-43, the ninth mission for Space Shuttle Atlantis, was a nine-day mission whose primary goal was launching the TDRS-E satellite (TDRS-5). The flight also tested an advanced heatpipe radiator for potential use on the then-future space station and conducted a variety of medical and materials science investigations.

    Crew[edit]

    Position Astronaut
    Commander John E. Blaha
    Third spaceflight
    Pilot Michael A. Baker
    First spaceflight
    Mission Specialist 1 Shannon Lucid
    Third spaceflight
    Mission Specialist 2 G. David Low
    Second spaceflight
    Mission Specialist 3 James C. Adamson
    Second and last spaceflight

    Crew seating arrangements[edit]

    Seat[1] Launch Landing
    Seats 1–4 are on the Flight Deck. Seats 5–7 are on the Middeck.
    S1 Blaha Blaha
    S2 Baker Baker
    S3 Lucid Adamson
    S4 Low Low
    S5 Adamson Lucid

    Preparations and launch[edit]

    The launch took place on August 2, 1991, 11:01:59 a.m. EDT. Launch was originally set for July 23, 1991, but was moved to July 24 to allow time to replace a faulty integrated electronics assembly that controls orbiter/external tank separation. The mission was postponed again about five hours before liftoff on July 24, 1991, due to a faulty main engine controller on the number three main engine. The controller was replaced and retested; launch was reset for August 1, 1991. Liftoff set for 11:01 a.m. delayed due to cabin pressure vent valve reading and postponed at 12:28 p.m. due to unacceptable return-to-launch site weather conditions. Launch finally occurred on August 2, 1991, without further delays.[2]

    Mission highlights[edit]

    Launch of Space Shuttle Atlantis from the Kennedy Space Center
    TDRS-E deployment from STS-43
    Atlantis passes over Florida. SHARE-II is prominent on the left.
    Crewmembers pose for on-orbit portrait in the middeck of Atlantis

    The primary payload, TDRS-E, attached to an Inertial Upper Stage (IUS), was deployed about six hours into flight, and the IUS propelled the satellite into geosynchronous orbit. TDRS-5 became the fourth member of the orbiting TDRS cluster. Secondary payloads were Space Station Heat Pipe Advanced Radiator Element (SHARE II); Shuttle Solar Backscatter Ultra-Violet (SSBUV) instrument; Tank Pressure Control Equipment (TPCE) and Optical Communications Through Windows (OCTW). Other experiments included Auroral Photography Experiment (APE-B) Protein Crystal Growth Ill (PCG Ill); Bioserve / Instrumentation Technology Associates Materials Dispersion Apparatus (BIMDA); Investigations into Polymer Membrane Processing (IPMP); Space Acceleration Measurement System (SAMS); Solid Surface Combustion Experiment (SSCE); Ultraviolet Plume imager (UVPI); and the Air Force Maui Optical Site (AMOS) experiment.[2]

    TDRS-E, which became TDRS-5 on orbit, was successfully boosted to geosynchronous orbit at more than 22,000 miles (35,400 km (22,000 mi)) above Earth by two firings of the Inertial Upper Stage (IUS) booster, the last of which occurred approximately 12½ hours into the mission. TDRS then deployed its antennas and solar panels, and separation from the IUS took place less than 45 minutes later.

    The TDRS network of satellites provides the vital communication link between Earth and low-orbiting spacecraft such as the Space Shuttle. Until the STS-43 deployment, there were three TDRS spacecraft on orbit above the equator: two were in the west position over the Pacific Ocean, southwest of Hawaii. TDRS-4 was in the east position over the northeast corner of Brazil. TDRS-B was lost in the Challenger accident in 1986. After STS-43, the two satellites in the west became on-orbit spares; TDRS-5, after activation, checkout and calibration, officially became the primary provider of services in the west location on October 7, 1991. It was stationed at 175° west longitude.

    Previously, orbiting spacecraft could communicate with Earth only when in sight of a ground tracking station – about 15 percent of each orbit. The TDRS network allows communication from 85% to 100% of an orbit, depending on the spacecraft's altitude.

    The crew was kept busy with the operation of varied experiments during the nine-day flight. The Space Station Heat Pipe Advanced Radiator Element (SHARE-II) experiment tested a natural cooling process for transferring thermal energy that could serve as a cooling system for Space Station Freedom. The Solid Surface Combustion Experiment (SSCE) provided some answers about how fire behaves in microgravity. The crew also activated other previously flown materials science experiments and participated in medical experiments in support of long-duration flights. One test showed that optical fibers could provide video and audio links between the flight deck and the payload bay.

    Crew members in space and flight controllers on the ground demonstrated their ingenuity when they adapted a camera part to replace one that had not been packed for the mission.

    The mission was also notable for being the first one to send an email from space. On August 9, 1991, astronauts Lucid and Adamson used AppleLink to write an email from a Macintosh Portable addressed to Marsha S. IvinsatJohnson Space Center.[3] The message read:

    Hello Earth! Greetings from the STS-43 crew. This is the first AppleLink from space. Having a GREAT time, wish you were here, ... send cryo and RCS! Hasta la vista, baby, ... we'll be back!

    The crew experienced some minor problems, none of them critical to the safety or success of the mission. A cooling system for Auxiliary Power Unit (APU 2) failed to activate during an on-orbit test. APU 2 is one of three redundant systems which provide hydraulic pressurization to orbiter steering systems during entry and landing. APU 2 was still available for use in landing.

    Atlantis landed on August 11, 1991, at 8:23:25 a.m. EDT, on Runway 15, at Kennedy Space Center.[2]

    Mission insignia[edit]

    According to the mission's official Press Kit, the STS-43 insignia portrays the evolution and continuity of the U.S. space program by highlighting thirty years of American crewed spaceflight experience, from Project Mercury to the Space Shuttle. The emergence of the shuttle Atlantis from the outlined configuration of the Mercury space capsule commemorates this special relationship. The energy and momentum of launch are conveyed by the gradations of blue which mark the shuttle's ascent from Earth to space. Once in Earth orbit, Atlantis' cargo bay opens to reveal the Tracking and Data Relay Satellite (TDRS) which appears in gold emphasis against the white wings of Atlantis and the stark blackness of space. As primary mission objective, the Tracking and Data Relay Satellite System (TDRSS) will enable almost continuous communication from Earth to space for future space shuttle missions. The stars on the insignia are arranged to suggest this mission's numerical designation, with four stars left of Atlantis and three to the right.[4]

    Wake-up calls[edit]

    NASA began a tradition of playing music to astronauts during the Project Gemini, and first used music to wake up a flight crew during Apollo 15.[5] Each track is specially chosen, often by the astronauts' families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.

    Day Song Artist/Composer Played for
    Day 2 Back in the High Life Steve Winwood
    Day 3 Excerpts from "Dances with the Wolves" soundtrack James Adamson
    Day 4 Custom music medley sung by friends of the STS-43 crew
    from Rockwell-Downey, in California.
    Day 5 Music of the Clear Lake High School Orchestra playing selections from "Phantom of the Opera".
    Commander John Blaha's daughter, Caroline, plays in the orchestra.
    Andrew Lloyd Webber John Blaha
    Day 6 What a Wonderful World Louis Armstrong
    Day 7 Cowboy in the Continental Suit Chris LeDoux James Adamson
    Day 8 Washington and Lee University fight song G. David Low
    Day 9 Sounds from Shannon Lucid's backyard

    See also[edit]

    References[edit]

    1. ^ "STS-43". Spacefacts. Retrieved February 26, 2014.
  • ^ a b c "NASA - STS-43". NASA. Retrieved November 16, 2022.
  • ^ "Macintosh Portable: Used in Space Shuttle". support.apple.com. Retrieved August 29, 2018.
  • ^ "NASA - Johnson Space Center History" (PDF). NASA. Public Domain This article incorporates text from this source, which is in the public domain.
  • ^ Fries, Colin. "Chronology of wakeup calls" (PDF). Public Domain This article incorporates text from this source, which is in the public domain.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=STS-43&oldid=1200794889"

    Categories: 
    Space Shuttle missions
    Spacecraft launched in 1991
    Hidden categories: 
    Source attribution
    Articles with short description
    Short description is different from Wikidata
    Use American English from January 2014
    All Wikipedia articles written in American English
    Use mdy dates from November 2022
    Webarchive template wayback links
     



    This page was last edited on 30 January 2024, at 07:53 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki