Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Crew  



1.1  Backup crew  





1.2  Crew seating arrangements  







2 Shuttle processing  





3 Payload  



3.1  Middeck payloads  





3.2  Other items  







4 Mission summary  





5 Spacewalks  





6 Wake-up calls  





7 See also  





8 References  





9 External links  














STS-61-B






العربية
 / Bân-lâm-gú
Български
Čeština
Dansk
Deutsch
Español
فارسی
Français
Galego
Italiano
עברית
Magyar
Nederlands

Norsk bokmål
Norsk nynorsk
Polski
Português
Русский
Slovenčina
Suomi
Svenska
Українська
Yorùbá

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


STS-61-B
Construction of the ACCESS structure.
NamesSpace Transportation System-23
Mission typeSatellites deployment
Technology
OperatorNASA
COSPAR ID1985-109A Edit this at Wikidata
SATCAT no.16273
Mission duration6 days, 21 hours, 4 minutes, 49 seconds (achieved)
Distance travelled3,970,181 km (2,466,956 mi)
Orbits completed109
Spacecraft properties
SpacecraftSpace Shuttle Atlantis
Launch mass118,664 kg (261,609 lb)
Landing mass93,316 kg (205,727 lb)
Payload mass21,791 kg (48,041 lb)
Crew
Crew size7
Members
  • Bryan D. O'Connor
  • Jerry L. Ross
  • Mary L. Cleave
  • Sherwood C. Spring
  • Charles D. Walker
  • Rodolfo Neri Vela
  • Start of mission
    Launch dateNovember 27, 1985, 00:29:00 UTC
    RocketSpace Shuttle Atlantis
    Launch siteKennedy Space Center, LC-39A
    ContractorRockwell International
    End of mission
    Landing dateDecember 3, 1985, 21:33:49 UTC
    Landing siteEdwards Air Force Base,
    Runway 22
    Orbital parameters
    Reference systemGeocentric orbit
    RegimeLow Earth orbit
    Perigee altitude361 km (224 mi)
    Apogee altitude370 km (230 mi)
    Inclination28.45°
    Period91.90 minutes
    Instruments
    • Assembly Concept for Construction of Erectable Space Structures (ACCESS)
  • Continuous Flow Electrophoresis System (CFES)
  • Diffusive Mixing of Organic Solutions (DMOS)
  • Experimental Assembly of Structures in EVA (EASE)
  • Getaway Special (GAS) canister
  • Morelos Payload Specialist Experiments (MPSE)
  • Orbiter Experiments (OEX)

  • STS-61-B mission patch

    Back row: Charles D. Walker, Jerry L. Ross, Mary L. Cleave, Sherwood C. Spring, Rodolfo Neri Vela
    Front row: Bryan D. O'Connor, Brewster H. Shaw Jr.
    ← STS-61-A (22)
    STS-61-C (24) →
     

    STS-61-B was the 23rd NASA Space Shuttle mission, and its second using Space Shuttle Atlantis. The shuttle was launched from Kennedy Space Center, Florida, on November 26, 1985. During STS-61-B, the shuttle crew deployed three communications satellites, and tested techniques of constructing structures in orbit. Atlantis landed at Edwards Air Force Base, California, at 16:33:49 EST on December 3, 1985, after 6 days, 21 hours, 4 minutes, and 49 seconds in orbit.

    STS-61-B marked the quickest turnaround of a Shuttle orbiter from launch to launch in history – just 54 days elapsed between Atlantis' launch on STS-51-J and launch on STS-61-B. As of August 2022, this is still the record for turn around between two flights of the same orbital space vehicle. The mission was also notable for carrying the first Mexican astronaut, Rodolfo Neri Vela. This was also Atlantis' second and final mission before the Space Shuttle Challenger disaster in 1986. The Challenger disaster would ground the shuttle fleet for two and a half years and Atlantis would not fly again until STS-27, which launched three years later on December 2, 1988.

    Crew[edit]

    Position Astronaut
    Commander United States Brewster H. Shaw Jr.
    Second spaceflight
    Pilot United States Bryan D. O'Connor
    First spaceflight
    Mission Specialist 1 United States Jerry L. Ross
    First spaceflight
    Mission Specialist 2 United States Mary L. Cleave
    First spaceflight
    Mission Specialist 3 United States Sherwood C. Spring
    Only spaceflight
    Payload Specialist 1 United States Charles D. Walker
    Third and last spaceflight
    Payload Specialist 2 Mexico Rodolfo Neri Vela
    Only spaceflight

    Backup crew[edit]

    Position Astronaut
    Payload Specialist 1 United States Robert J. Wood
    First spaceflight
    Payload Specialist 2 Mexico Ricardo Peralta y Fabi
    First spaceflight

    Crew seating arrangements[edit]

    Seat[1] Launch Landing
    Seats 1–4 are on the Flight Deck. Seats 5–7 are on the Middeck.
    S1 Shaw Shaw
    S2 O'Connor O'Connor
    S3 Ross Spring
    S4 Cleave Cleave
    S5 Spring Ross
    S6 Walker Walker
    S7 Neri Vela Neri Vela

    Shuttle processing[edit]

    After landing at the Edwards Air Force Base at the end of STS-51-J on October 7, 1985, Atlantis returned to the Kennedy Space Center on October 12, 1985. The shuttle was moved directly into an Orbiter Processing Facility (OPF), where post-flight de-servicing and pre-flight processing took place simultaneously.

    After only 26 days in the OPF, a record fast processing in the history of the Space Shuttle program, the shuttle was rolled to the Vehicle Assembly Building (VAB) on November 7, 1985.[2] Atlantis was mated with the External Tank (ET) and Solid Rocket Booster (SRB) stack and was rolled out to launch LC-39A on November 12, 1985.

    Payload[edit]

    Deployment of the Satcom-K2 satellite

    Three satellites were deployed during this mission: Aussat-2, Morelos-2, and Satcom-K2. Aussat-2 and Morelos-2 were the second satellites in their series (the first satellites in the series were deployed during STS-51-I and STS-51-G). Both of these were Hughes Space and Communications HS-376 satellites and were equipped with a Payload Assist Module (PAM-D) booster to reach geostationary transfer orbit (GTO). Satcom-K2 was a version of the RCA 4000 series satellites, which were owned and operated by RCA American Communications (RCA). This satellite was deployed using a PAM-D2 booster (which was a larger version of the PAM-D). This was the first flight of the PAM-D2 booster on a Space Shuttle.

    All three satellites were successfully deployed, one at a time, and their booster stages fired automatically to lift them to geostationary transfer orbits. Their respective owners assumed charge, and later fired the onboard kick motorsatapogee, to circularize the orbits and align them with the equator.

    Middeck payloads[edit]

    Other items[edit]

    Acheckered racing flag was carried on board Atlantis during STS-61-B; the flag is now on display at the Indianapolis Motor Speedway Hall of Fame Museum. This was also the second test flight of the Orbiter Experiments (OEX) advanced autopilot. It ran for approximately 65 hours and demonstrated the ability to fly the orbiter on nose jets only, aft jets only, to automatically stationkeep on another satellite and to fly an orbit with zero aerodynamic drag. The OEX autopilot was also more fuel efficient than the baseline system.

    Mission summary[edit]

    Night launch of Atlantis at the beginning of the STS-61-B mission
    Construction of the EASE structure

    Space Shuttle Atlantis lifted off from Launch Complex 39A at Kennedy Space Center at 19:29:00 p.m. EST on November 26, 1985. The launch marked the second night launch of the Space Shuttle program, and the ninth and final flight of 1985.[3]

    A key element of the mission's objectives was EASE/ACCESS, an experiment in assembling large structures in space. EASE/ACCESS was a joint venture between the Langley Research Center (LRC) and the Marshall Space Flight Center (MSFC). ACCESS was a "high-rise" tower composed of many small struts and nodes. EASE was a geometric structure shaped like an inverted pyramid, that was composed of a few large beams and nodes. Together, these experiments demonstrated the feasibility of assembling large preformed structures in space. Astronauts Ross and Spring performed two spacewalks on the mission, which marked the 50th, and 51st extravehicular activity (EVAs) for the United States, and the 12th and the 13th for the Shuttle program. An IMAX camera mounted in the cargo bay filmed the activities of the astronauts engaged in the EASE/ACCESS work, as well as other scenes of interest.

    "This is probably not the preferred way of building a space station", Ross said later of EASE.[4][5] The astronauts reported that the most difficult part of the spacewalks was torquing their own masses while holding the EASE beams. They found that ACCESS worked well, while EASE required too much free floating. The astronauts judged that performing six-hour spacewalks every other day over a five or six-day period was feasible, and recommended glove changes to reduce hand fatigue. Ross said in the EVA debrief that the crew had tried to have the Manned Maneuvering Unit (MMU) manifested for use in the second spacewalk, because "for certain applications it would be very useful. In particular if you were building portions of a space station attached to the orbiter, then moving those portions farther than the manipulator arm could transport them". He added that the MMU could be used to attach cable runs and instruments in places that were out of reach of the shuttle's robotic arm (Canadarm).

    During the mission astronaut Rodolfo Neri Vela accomplished a series of experiments, that were primarily related to human physiology. He also photographed Mexico and Mexico City as part of the mission's Earth observations. However, Commander Brewster Shaw installed a padlock on the hatch control because he was "particularly concerned" that the Mexican could "flip out" during the mission.[6] Shaw had noted that he didn't think that Neri Vela noticed the padlock, but that the other members of the crew did.[6] Astronaut Charles Walker again operated the Continuous Flow Electrophoresis System (CFES), the third flight of this larger and improved equipment, to produce commercial pharmaceutical products in microgravity. An experiment in Diffusive Mixing of Organic Solutions (DMOS), was conducted successfully for 3M. The object of this experiment was to grow single crystals that were larger and more pure than any that could be grown on Earth. One Getaway Special (GAS) canister stored in Atlantis's payload bay carried a Canadian student experiment, which involved the fabrication of mirrors in microgravity with higher performance than ones made on Earth.

    All the experiments on this mission were successfully accomplished, and all equipment operated within established parameters. Atlantis landed safely at Edwards Air Force Base at 16:33:49 EST on December 3, 1985, after a mission lasting 6 days, 21 hours, 4 minutes, 49 seconds. Atlantis landed one orbit earlier than planned due to lighting concerns at the Edwards. Rollout distance on landing was 3,279 m (10,758 ft) lasting 78 seconds.[7]

    Spacewalks[edit]

    Two spacewalks were conducted during the STS-61-B mission to demonstrate assembly techniques which might be used in space station assembly.[4]

    EVA Spacewalkers Start (UTC) End Duration
    EVA 1 Jerry L. Ross
    Sherwood C. Spring
    November 29, 1985 November 29, 1985 5 hours 32 minutes
    EVA 1 focused on human performance during assembling of an experimental erectable truss structure. Ross and Spring first assembled the 3.4 m (11 ft) Assembly Concept for Construction of Erectable Space Structures (ACCESS) assembly jig in Atlantis' payload bay. Each cell was assembled in the jig, then pushed up so that the next cell could be assembled. The astronauts assembled the ACCESS truss in 55 minutes, (EVA time line allotted two hours for a single ACCESS assembly) so they assembled it and built it again. The Experimental Assembly of Structures through EVA (EASE) task involved putting together beams weighing 29 kg (64 lb) to make a 3.6 m (12 ft) three-sided pyramid assessed the capabilities of free-floating astronauts. EASE was scheduled to be assembled six times, but Ross and Spring managed eight assemblies. During the first four assemblies the astronauts used foot restraints. In his post flight debriefing, Spring noted that his fingers grew numb during the third EASE assembly and very tired during the fourth. At the end of the EVA Spring assembled and hand-deployed a small target satellite to be used after the EVA as a station-keeping target for Atlantis, which played the role of an automated orbital maneuvering vehicle in rendezvous software tests.
    EVA 2 Jerry L. Ross
    Sherwood C. Spring
    December 1, 1985 December 1, 1985 6 hours 41 minutes
    The purpose of EVA 2 was to assess the ability of astronauts to handle large structural elements and the ability of the Shuttle's robotic arm (Canadarm), to support future station assembly. Ross and Spring assembled nine bays of ACCESS, then placed parts for the tenth bay on the Canadarm. Ross stepped into the Manipulator Foot Restraint (MFR) and astronaut Mary C. Cleave positioned him within reach of the top of the ACCESS girder, where he assembled the tenth bay. The parts were not tethered. Ross performed a cable run assembly simulation by attaching a tether along the side of the tower while Cleave positioned him. Then Spring released the bottom of the tower so Ross could try to precisely handle the beam from the RMS. He replaced it in the assembly jig where it started, demonstrating astronaut ability to assemble a truss in one place and install it in another. Spring then replaced Ross on the MFR. He changed a beam on the tower to simulate structural repair, then pointed the truss at the Moon to judge his handling ability. The astronauts took down ACCESS, and Spring assembled EASE from the RMS. Before finishing, he joined two beams to simulate handling a thermal control heat pipe. Ross unlatched the EASE pyramid so that Spring could maneuver it. Then he replaced Spring on the MFR to duplicate the EASE activities.

    Wake-up calls[edit]

    NASA began a tradition of playing music to astronauts during the Project Gemini, and first used music to wake up a flight crew during Apollo 15. Each track is specially chosen, often by the astronauts' families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.[8]

    Flight Day Song Artist/Composer Played for
    Day 2 "Air Force Hymn" Brewster H. Shaw Jr.
    Day 3 "America the Beautiful"
    Day 4 "Marine Corps Hymn" Bryan O'Connor
    Day 5 "Notre Dame Victory March" Jerry L. Ross
    Day 6 "Born in the U.S.A." Bruce Springsteen

    See also[edit]

    References[edit]

    1. ^ "STS-61B". Spacefacts. Retrieved February 26, 2014.
  • ^ Chris Gebhardt (July 2, 2011). "OV-104/ATLANTIS: An International Vehicle for a Changing World". NASASpaceFlight.com. Retrieved July 3, 2011.
  • ^ "SPACE SHUTTLE MISSION STS-61B PRESS KIT" (PDF). NASA. November 1985. Retrieved July 3, 2011. Public Domain This article incorporates text from this source, which is in the public domain.
  • ^ a b David S. Portree and Robert C. Trevino (October 1997). "Walking to Olympus: An EVA chronology (Monograpahs in Aerospace History Series #7)" (PDF). NASA History Office. Retrieved July 3, 2011. Public Domain This article incorporates text from this source, which is in the public domain.
  • ^ "Astronauts Believe Lengthy EVA Building Sessions are Feasible". Aviation Week & Space Technology. December 16, 1985. pp. 20–21.
  • ^ a b Evans, Ben (2012). Tragedy and triumph in orbit: the eighties and early nineties. New York, N.Y.: Springer. p. 424. ISBN 978-1-46143-430-6.
  • ^ "STS-61B". NASA. Retrieved July 3, 2011. Public Domain This article incorporates text from this source, which is in the public domain.
  • ^ Fries, Colin (June 25, 2007). "Chronology of Wakeup Calls" (PDF). NASA. Retrieved August 13, 2007.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=STS-61-B&oldid=1165225565"

    Categories: 
    Space Shuttle missions
    Edwards Air Force Base
    1985 in spaceflight
    Spacecraft launched in 1985
    Hidden categories: 
    Source attribution
    Articles with short description
    Short description is different from Wikidata
    Use American English from January 2014
    All Wikipedia articles written in American English
    Use mdy dates from October 2022
    Articles containing potentially dated statements from August 2022
    All articles containing potentially dated statements
    Webarchive template wayback links
     



    This page was last edited on 13 July 2023, at 20:13 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki