Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Crew  





2 Mission highlights  





3 External tank  





4 See also  





5 References  





6 External links  














STS-71






العربية
 / Bân-lâm-gú
Български
Čeština
Dansk
Deutsch
فارسی
Français
Galego
Italiano
עברית
Magyar
Nederlands

Norsk nynorsk
Polski
Português
Русский
Slovenčina
Svenska
Українська
Yorùbá

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


STS-71
Atlantis docked to Mir, photographed from the departing Soyuz-TM spacecraft Uragan
NamesSpace Transportation System-71
Mission typeShuttle-Mir
OperatorNASA
COSPAR ID1995-030A Edit this at Wikidata
SATCAT no.23600
Mission duration9 days, 19 hours, 23 minutes, 9 seconds
Distance travelled6,600,000 kilometres (4,100,000 mi)
Orbits completed153
Spacecraft properties
SpacecraftSpace Shuttle Atlantis
Payload mass12,191 kilograms (26,877 lb)
Crew
Crew size7 up
8 down
Members
  • Charles J. Precourt
  • Ellen S. Baker
  • Gregory J. Harbaugh
  • Bonnie J. Dunbar
  • Launching
  • Nikolai Budarin
  • Landing
  • Vladimir Dezhurov
  • Norman E. Thagard
  • Start of mission
    Launch dateJune 27, 1995, 19:32:19 (1995-06-27UTC19:32:19Z) UTC
    Launch siteKennedy LC-39A
    End of mission
    Landing dateJuly 7, 1995, 14:55:28 (1995-07-07UTC14:55:29Z) UTC
    Landing siteKennedy SLF Runway 15
    Orbital parameters
    Reference systemGeocentric
    RegimeLow Earth
    Perigee altitude342 kilometres (213 mi)
    Apogee altitude342 kilometres (213 mi)
    Inclination51.6 degrees
    Period88.9 min
    Docking with Mir
    Docking portKristall forward
    Docking dateJune 29, 1995, 13:00:16 UTC
    Undocking dateJuly 4, 1995, 11:09:42 UTC
    Time docked4 days, 22 hours, 9 minutes 26 seconds

    Left to right – Seated: Dezhurov, Gibson, Solovyev; Standing: Thagard, Strekalov, Harbaugh, Baker, Precourt, Dunbar, Budarin
    ← STS-67 (68)
    STS-70 (70) →
     

    As the third mission of the US/Russian Shuttle-Mir Program, STS-71 became the first Space Shuttle to dock with the Russian space station Mir. STS-71 began on June 27, 1995, with the launch of Space Shuttle Atlantis from launchpad 39A at the Kennedy Space Center in Florida. The Shuttle delivered a relief crew of two cosmonauts Anatoly Solovyev and Nikolai Budarin to the station and recovered Increment astronaut Norman Thagard. Atlantis returned to Earth on July 7 with a crew of eight. It was the first of seven straight missions to Mir flown by Atlantis, and the second Shuttle mission to land with an eight-person crew after STS-61-A in 1985.

    For the five days the Shuttle was docked to Mir they were the largest spacecraft in orbit at the time. STS-71 marked the first docking of a Space Shuttle to a space station, the first time a Shuttle crew switched members with the crew of a station, and the 100th crewed space launch by the United States. The mission carried Spacelab and included a logistical resupply of Mir. Together the Shuttle and station crews conducted various on-orbit joint US/Russian life science investigations with Spacelab along with the Shuttle Amateur Radio Experiment-II (SAREX-II) experiment.

    Crew[edit]

    Position Launching Crew Member Landing Crew Member
    Commander United States Robert L. Gibson
    Fifth and last spaceflight
    Pilot United States Charles J. Precourt
    Second spaceflight
    Mission Specialist 1 United States Ellen S. Baker
    Third and last spaceflight
    Mission Specialist 2 United States Gregory J. Harbaugh
    Third spaceflight
    Mission Specialist 3 United States Bonnie J. Dunbar
    Fourth spaceflight
    Mission Specialist 4 Russia Anatoly Solovyev, RKA
    EO-19
    Fourth spaceflight
    Russia Gennady Strekalov, RKA
    EO-18
    Fifth and last spaceflight
    Mission Specialist 5 Russia Nikolai Budarin, RKA
    EO-19
    First spaceflight
    Russia Vladimir Dezhurov, RKA
    EO-18
    First spaceflight
    Mission Specialist 6 None United States Norman E. Thagard
    EO-18
    Fifth and last spaceflight

    Mission highlights[edit]

    Space Shuttle Atlantis launches on mission STS-71

    The primary objectives of this flight were to rendezvous and perform the first docking between the Space Shuttle and the Russian Space Station Mir on June 29. In the first U.S.-Russian (Soviet) docking in twenty years, Atlantis delivered a relief crew of two cosmonauts Anatoly Solovyev and Nikolai Budarin to Mir.[1]

    Other prime objectives were on-orbit joint United States of America-Russian life sciences investigations aboard SPACELAB/Mir, logistical resupply of the Mir and recovery of US astronaut Norman E. Thagard.

    Secondary objectives included filming with the IMAX camera and the Shuttle Amateur Radio Experiment-II (SAREX-II) experiment.[1]

    STS-71 was the 100th U.S. human space launch conducted from Cape Canaveral, the first U.S. Space Shuttle-Russian Space Station docking and joint on-orbit operations; largest spacecraft ever in orbit; and the first on-orbit changeout of Shuttle crew.

    The rendezvous sequence began at 15:32:19 EDT with a lift-off in-plane with Mir's orbit, at the opening of the 10 minute 19 second launch window. Ascent was nominal with no OMS 1 burn required.[1] The OMS 2 burn, initiated at 42 minutes 58 seconds Mission Elapsed Time, adjusted the orbit to 160 x 85.3 nautical miles. It was the lowest ever perigee altitude flown by an orbiter.[2] This facilitated a very rapid initial catch up rate with Mir of about 880 nautical miles per orbit.[3] Almost three hours later the orbit was raised to more typical values of 210 x 159 nautical miles by the OMS 3 burn.

    Docking occurred at 9 am EDT, June 29, using R-Bar or Earth radius vector approach, with Atlantis closing in on Mir from directly below. R-bar approach allows natural forces to brake the orbiter's approach more than would occur along standard approach directly in front of the space station; also, an R-bar approach minimizes the number of orbiter jet firings needed for approach. The manual phase of the docking began with Atlantis about a half-mile (800 m) below Mir, with Gibson at the controls on aft flight deck. Stationkeeping was performed when the orbiter was about 75 metres (246 ft) from Mir, pending approval from Russian and U.S. flight directors to proceed. Gibson then maneuvered the orbiter to a point about 10 metres (33 ft) from Mir before beginning the final approach to station. Closing rate was close to the targeted 0.1 foot per second (30 mm/s), being approximately 0.107 foot per second (33 mm/s) at contact. Interface contact was nearly flawless: less than 25 millimetres (0.98 in) lateral misalignment and an angular misalignment of less than 0.5 degrees per axis. No braking jet firings had been required.[4] Docking occurred about 216 nautical miles (400 kilometres (250 mi)) above Lake Baikal region of the Russian Federation. The Orbiter Docking System (ODS) with Androgynous Peripheral Docking System served as the actual connection point to a similar interface on the docking port on Mir's Kristall module. ODS, located in the forward payload bay of Atlantis, performed flawlessly during the docking sequence.

    When linked, Atlantis and Mir formed the largest spacecraft ever in orbit, with a total mass of about 225 metric tons (almost one-half million pounds), orbiting some 218 nautical miles (404 kilometres (251 mi)) above the Earth. After hatches on each side opened, STS-71 crew passed into Mir for a welcoming ceremony. On the same day, the Mir 18 crew officially transferred responsibility for the station to the Mir 19 crew, and the two crews switched spacecraft.

    Vladimir Dezhurov and "Hoot" Gibson shake hands in orbit, a homage to the Apollo-Soyuz Test Project (ASTP). Later that day, President Bill Clinton announced that this handshake was a major breakthrough towards the end of the Cold War.

    For the next five days, about 100 hours in total, joint U.S.-Russian operations were conducted, including biomedical investigations, and transfer of equipment to and from Mir. Fifteen separate biomedical and scientific investigations were conducted, using the Spacelab module installed in the aft portion of Atlantis's payload bay, and covering seven different disciplines: cardiovascular and pulmonary functions; human metabolism; neuroscience; hygiene, sanitation and radiation; behavioral performance and biology; fundamental biology; and microgravity research. The Mir 18 crew served as test subjects for investigations. Three Mir 18 crew members also carried out an intensive programme of exercise and other measures to prepare for re-entry into gravity environment after more than three months in space.

    Numerous medical samples as well as disks and cassettes were transferred to Atlantis from Mir, including more than 100 urine and saliva samples, about 30 blood samples, 20 surface samples, 12 air samples, several water samples and numerous breath samples taken from Mir 18 crew members. Also moved was a broken Salyut-5 computer. Transferred to Mir were more than 450 kilograms (990 lb) of water generated by the orbiter for waste system flushing and electrolysis; specially designed spacewalking tools for use by the Mir 19 crew during a spacewalk to repair a jammed solar array on the Spektr module; and transfer of oxygen and nitrogen from Shuttle's environmental control system to raise air pressure on the station, to improve Mir's consumables margin.

    Atlantis lands at the Kennedy Space Center at the end of STS-71.

    The spacecraft undocked on July 4, following a farewell ceremony, with the Mir hatch closing at 3:32 pm EDT. July 3 and hatch on Orbiter Docking System shut 16 minutes later. Gibson compared separation sequence to a "cosmic" ballet: Prior to the Mir-Atlantis undocking, the Mir 19 crew temporarily abandoned station, flying away from it in their Soyuz spacecraft so they could record images of Atlantis and Mir separating. Soyuz unlatched at 6:55 am EDT, and Gibson undocked Atlantis from Mir at 7:10 am EDT. Whilst both spacecraft were undocked from Mir, the station suffered a computer malfunction and started to drift in attitude. The Mir 19 crew performed a hasty re-docking, monitored by Atlantis. They subsequently replaced computer hardware allowing them to regain attitude control.

    The returning crew of eight equaled the largest crew (STS-61-A, October 1985) in Shuttle history. To ease their re-entry into gravity environment after more than 100 days in space, Mir 18 crew members Thagard, Dezhurov and Strekalov lay supine in custom-made recumbent seats installed prior to landing in the orbiter middeck.

    Inflight problems included a glitch with General Purpose Computer 4 (GPC 4), which was declared failed when it did not synchronize with GPC 1; subsequent troubleshooting indicated it was an isolated event, and GPC 4 operated satisfactorily for the remainder of mission.

    During the SAREX portion of the flight, the crew contacted several schools. One was Redlands High School in Redlands, California. Charlie Precourt was able to contact students, former students and technicians that built the communications package. A cross polarized, dual band yagi antenna array and automatic rotor was installed on the roof of the electronics classroom. A dual band radio was installed inside the radio room of the classroom. The contact window lasted about 10 minutes, during which time, about twelve people were able to ask questions. While most were basic or technical questions, one was peculiar. "What would happen of you sneezed inside your helmet?" Precourt answered that you'd probably, "spray your face shield a little bit.." and carry on.

    External tank[edit]

    The external tank used on this mission (ET-70)[5] was involved in a historic marine salvage court case.[6] The tank was being delivered by barge in November 1994, when the tow vehicle encountered issues in Hurricane Gordon. Their mayday signal was picked up by the oil tanker Cherry Valley, which responded and towed the tug and its cargo to safety.[7] Under the tradition of marine salvage, NASA offered $5 million to the crew of the tanker as a reward, but the United States Department of Justice reduced the offer to $1 million.[7] The tanker company and crew sued and were awarded $6.4 million, believed to be the largest such award in U.S. history.[7] This was reduced to $4.125 million on appeal.[6] The crew split the award with their employer. At least one crew member was able to use his cut of the proceeds to buy a house, which he calls "the house that NASA bought."[7]

    See also[edit]

    References[edit]

    1. ^ a b c Public Domain This article incorporates public domain material from Dumoulin, Jim. STS-71 (69). National Aeronautics and Space Administration. (June 29, 2001).
  • ^ STS-71 Space Shuttle Mission Report (Report). NASA. 1995. p. 3.
  • ^ "STS-71 Day 1 Highlights". NASA. 1995.
  • ^ STS-71 Space Shuttle Mission Report (Report). NASA. 1995. p. 5.
  • ^ Fricke, Robert W. Jr. (August 1995). "STS-71 Space Shuttle Mission Report" (PDF). NASA.
  • ^ a b Margate Shipping Co. v. M/V JA Orgeron, US 143 F.3d 976 (5th Cir. 1998) (July 1, 1998).
  • ^ a b c d "Rescues at sea, and how to make a fortune". Planet Money. NPR. January 26, 2024. Retrieved February 3, 2024.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=STS-71&oldid=1211363743"

    Categories: 
    Space Shuttle missions
    Spacecraft launched in 1995
    Hidden categories: 
    Wikipedia articles incorporating text from NASA
    Articles with short description
    Short description is different from Wikidata
    Use mdy dates from October 2022
    Webarchive template wayback links
    Use American English from January 2014
    All Wikipedia articles written in American English
     



    This page was last edited on 2 March 2024, at 04:28 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki